1981Unpublished venueRequires access

ON THE DYNAMIC RESPONSE OF A CONCRETE BARGE MOUNTED ON A SUBMERSIBLE BARGE IN WAVES

Toshihiro Inoue, Yuichi Kobayashi

Open publisher page 0 citations

Abstract

A new plant construction method for providing power plants, petrochemical processing plants, etc. in remote areas of developing countries is now being considered. The method has three processes; 1. Building of a concrete barge with plant facilities ; 2. Towing the plant barge to the site; 3. Setting the plant barge in position. There are two methods of towing a plant barge to its destination. One is towing the plant barge directly and the other is transporting the plant barge mounted on a submersible barge . For the purpose of estimating the design wave loads on a plant barge during a dry-towing project, experiments have been performed with a model plant barge and three model submersible barges. The experiments were made in regular wave conditions and with variable wave lengths, wave height, wave direction and towing speed.

About this research paper

What this paper is about

A new plant construction method for providing power plants, petrochemical processing plants, etc. in remote areas of developing countries is now being considered. The method has three processes; 1. Building of a concrete barge with plant facilities ; 2. Towing the plant barge to the site; 3. Setting the plant barge in position. There are two methods of towing a plant barge to its destination. One is towing the plant barge directly and the other is transporting the plant barge mounted on a submersible barge . For the purpose of estimating the design wave loads on a plant barge during a dry-towing project, experiments have been performed with a model plant barge and three model submersible barges. The experiments were made in regular wave conditions and with variable wave lengths, wave height, wave direction and towing speed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A new plant construction method for providing power plants, petrochemical processing plants, etc. in remote areas of developing countries is now being considered. The method has three processes; 1. Building of a concrete barge with plant facilities ; 2. Towing the plant barge to the site; 3. Setting the plant barge in position. There are two methods of towing a plant barge to its destination. One is towing the plant barge directly and the other is transporting the plant barge mounted on a submersible barge . For the purpose of estimating the design wave loads on a plant barge during a dry-towing project, experiments have been performed with a model plant barge and three model submersible barges. The experiments were made in regular wave conditions and with variable wave lengths, wave height, wave direction and towing speed.

Key concepts: BARGE, Towing, Marine engineering, Engineering, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
ON THE DYNAMIC RESPONSE OF A CONCRETE BARGE MOUNTED ON A SUBMERSIBLE BARGE IN WAVES — Research Paper | ScholarLens