1993Unpublished venueRequires access

PREDICTING VEHICLE DELAYS DURING MAINTENANCE OR RECONSTRUCTION ACTIVITY ON TWO-LANE HIGHWAYS. FINAL REPORT

Mark Cassidy, Young Tae Son, David V. Rosowsky

Open publisher page 1 citations

Abstract

Maintenance or reconstruction activity on a two-lane highway often requires a lane closure. The implementation of traffic control, required to maintain traffic flow through the work zone, typically produces significant motorist delays. This report describes the development of analytical procedures for estimating/predicting average vehicle delays prevailing under specified one-way traffic control scenarios. The proposed procedures are applicable to an array of maintenance or construction activity types operating during undersaturated or oversaturated conditions.

About this research paper

What this paper is about

Maintenance or reconstruction activity on a two-lane highway often requires a lane closure. The implementation of traffic control, required to maintain traffic flow through the work zone, typically produces significant motorist delays. This report describes the development of analytical procedures for estimating/predicting average vehicle delays prevailing under specified one-way traffic control scenarios. The proposed procedures are applicable to an array of maintenance or construction activity types operating during undersaturated or oversaturated conditions.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Maintenance or reconstruction activity on a two-lane highway often requires a lane closure. The implementation of traffic control, required to maintain traffic flow through the work zone, typically produces significant motorist delays. This report describes the development of analytical procedures for estimating/predicting average vehicle delays prevailing under specified one-way traffic control scenarios. The proposed procedures are applicable to an array of maintenance or construction activity types operating during undersaturated or oversaturated conditions.

Key concepts: Highway maintenance, Closure (psychology), Transport engineering, Traffic flow (computer networking), Control (management), Work (physics), Computer science, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
PREDICTING VEHICLE DELAYS DURING MAINTENANCE OR RECONSTRUCTION ACTIVITY ON TWO-LANE HIGHWAYS. FINAL REPORT — Research Paper | ScholarLens