THE SAINT-NAZAIRE-SAINT-BREVIN BRIDGE AND ITS TWO ACCESS VIADUCTS

J J Bianchi

Open publisher page 0 citations

Abstract

THE STRUCTURE DESCRIBED IS THE LONGEST IN FRANCE AND WILL HAVE BEEN BUILT IN 3 YEARS. IT IS FOUNDED ON VERTICAL BENCHES OF GNEISS COVERED WITH LAYERS OF SAND AND MUD. IT COMPRISES 2 PRESTRESSED CONCRETE ACCESS VIADUCTS WHICH CONNECT EACH SIDE TO THE CENTRAL METAL BRIDGE. THE LATTER HAS THREE SPANS, A STAYED GIRDER BRIDGE DECK HELD IN POSITION BY GALVANIZED CABLES ANCHORED TO THE TOP OF TWO BRIDGE TOWERS. THE BRIDGE DECK OF THE ACCESS VIADUCTS CONSISTS OF 4 PRECAST PRESTRESSED CONCRETE GIRDERS. PILED FOUNDATIONS ARE MADE OF TUBULAR REINFORCED CONCRETE. SLIDING FORMS WERE USED FOR THEIR CONSTRUCTION. THE MAIN PIERS HAVE THE SHAPE OF A HOLLOW CAISSON AND WERE ALSO BUILT WITH SLIDING FORMS. THE GIRDERS OF THE VIADUCT DECK WERE PRECAST BEHIND EACH ABUTMENT AND LAUNCHED WITH THE HELP OF TWO LATTICED GIRDERS FITTED WITH FORE- AND AFT-CUTWATERS.

About this research paper

What this paper is about

THE STRUCTURE DESCRIBED IS THE LONGEST IN FRANCE AND WILL HAVE BEEN BUILT IN 3 YEARS. IT IS FOUNDED ON VERTICAL BENCHES OF GNEISS COVERED WITH LAYERS OF SAND AND MUD. IT COMPRISES 2 PRESTRESSED CONCRETE ACCESS VIADUCTS WHICH CONNECT EACH SIDE TO THE CENTRAL METAL BRIDGE. THE LATTER HAS THREE SPANS, A STAYED GIRDER BRIDGE DECK HELD IN POSITION BY GALVANIZED CABLES ANCHORED TO THE TOP OF TWO BRIDGE TOWERS. THE BRIDGE DECK OF THE ACCESS VIADUCTS CONSISTS OF 4 PRECAST PRESTRESSED CONCRETE GIRDERS. PILED FOUNDATIONS ARE MADE OF TUBULAR REINFORCED CONCRETE. SLIDING FORMS WERE USED FOR THEIR CONSTRUCTION. THE MAIN PIERS HAVE THE SHAPE OF A HOLLOW CAISSON AND WERE ALSO BUILT WITH SLIDING FORMS. THE GIRDERS OF THE VIADUCT DECK WERE PRECAST BEHIND EACH ABUTMENT AND LAUNCHED WITH THE HELP OF TWO LATTICED GIRDERS FITTED WITH FORE- AND AFT-CUTWATERS.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE STRUCTURE DESCRIBED IS THE LONGEST IN FRANCE AND WILL HAVE BEEN BUILT IN 3 YEARS. IT IS FOUNDED ON VERTICAL BENCHES OF GNEISS COVERED WITH LAYERS OF SAND AND MUD. IT COMPRISES 2 PRESTRESSED CONCRETE ACCESS VIADUCTS WHICH CONNECT EACH SIDE TO THE CENTRAL METAL BRIDGE. THE LATTER HAS THREE SPANS, A STAYED GIRDER BRIDGE DECK HELD IN POSITION BY GALVANIZED CABLES ANCHORED TO THE TOP OF TWO BRIDGE TOWERS. THE BRIDGE DECK OF THE ACCESS VIADUCTS CONSISTS OF 4 PRECAST PRESTRESSED CONCRETE GIRDERS. PILED FOUNDATIONS ARE MADE OF TUBULAR REINFORCED CONCRETE. SLIDING FORMS WERE USED FOR THEIR CONSTRUCTION. THE MAIN PIERS HAVE THE SHAPE OF A HOLLOW CAISSON AND WERE ALSO BUILT WITH SLIDING FORMS. THE GIRDERS OF THE VIADUCT DECK WERE PRECAST BEHIND EACH ABUTMENT AND LAUNCHED WITH THE HELP OF TWO LATTICED GIRDERS FITTED WITH FORE- AND AFT-CUTWATERS.

Key concepts: Precast concrete, Girder, Deck, Caisson, Bridge (graph theory), Structural engineering, Engineering, Abutment