DOUBLE-DECK ORBITAL METRO WILL KNIT THE URBAN RAIL NETWORK TOGETHER

E L Baillon

Open publisher page 0 citations

Abstract

Construction of a new line of the Barcelona metro system is currently being planned as a way to complete and connect up the entire rail network in central Barcelona. Public works contracts have been awarded for design, construction and technical assistance for the new 41- kilometer Line 9, which will have 45 stations. Both directions of the line will be built within a single tunnel bore that will be split by a horizontal concrete slab. Trains will operate one above the other. Completion is expected in about five years.

About this research paper

What this paper is about

Construction of a new line of the Barcelona metro system is currently being planned as a way to complete and connect up the entire rail network in central Barcelona. Public works contracts have been awarded for design, construction and technical assistance for the new 41- kilometer Line 9, which will have 45 stations. Both directions of the line will be built within a single tunnel bore that will be split by a horizontal concrete slab. Trains will operate one above the other. Completion is expected in about five years.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction of a new line of the Barcelona metro system is currently being planned as a way to complete and connect up the entire rail network in central Barcelona. Public works contracts have been awarded for design, construction and technical assistance for the new 41- kilometer Line 9, which will have 45 stations. Both directions of the line will be built within a single tunnel bore that will be split by a horizontal concrete slab. Trains will operate one above the other. Completion is expected in about five years.

Key concepts: Deck, Train, Transport engineering, Line (geometry), Engineering, Slab, Public transport, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
DOUBLE-DECK ORBITAL METRO WILL KNIT THE URBAN RAIL NETWORK TOGETHER — Research Paper | ScholarLens