1973Traffic engineering & controlRequires access

BUS PRIORITY IN GREATER LONDON. 3. DEVELOPMENT OF BUS LANE SCHEMES

D Feather, J A Cracknell, J A Forster

Open publisher page 3 citations

Abstract

THE TECHNICAL DEVELOPMENT OF BUS PRIJORITY SCHEMES IS DISCUSSED. AFTER AN INITIAL CONSIDERATION OF THE VARIOUS POSSIBLE CONFIGURATIONS, NOTE IS MADE OF THE USE OF PART-TIME, WITH-FLOW BUS LANES AND STANDARDS OF LANE WIDTHS AND TRAFFIC FLOW THAT HAVE BEEN ESTABLISHED ARE SET OUT. PEDESTRIAN AND SERVICING FACILITIES ARE DISCUSSED. SOME INTERESTING SCHEMES EITHER IN OPERATION OR SHORTLY TO BE IMPLEMENTED, AND FURTHER IDEAS UNDER CONSIDERATION ARE DESCRIBED. IN CONCLUSION, THE RANGE OF COSTS AND EXPECTED BENEFITS ARE GIVEN IN BROAD TERMS. /IRRD/

About this research paper

What this paper is about

THE TECHNICAL DEVELOPMENT OF BUS PRIJORITY SCHEMES IS DISCUSSED. AFTER AN INITIAL CONSIDERATION OF THE VARIOUS POSSIBLE CONFIGURATIONS, NOTE IS MADE OF THE USE OF PART-TIME, WITH-FLOW BUS LANES AND STANDARDS OF LANE WIDTHS AND TRAFFIC FLOW THAT HAVE BEEN ESTABLISHED ARE SET OUT. PEDESTRIAN AND SERVICING FACILITIES ARE DISCUSSED. SOME INTERESTING SCHEMES EITHER IN OPERATION OR SHORTLY TO BE IMPLEMENTED, AND FURTHER IDEAS UNDER CONSIDERATION ARE DESCRIBED. IN CONCLUSION, THE RANGE OF COSTS AND EXPECTED BENEFITS ARE GIVEN IN BROAD TERMS. /IRRD/

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE TECHNICAL DEVELOPMENT OF BUS PRIJORITY SCHEMES IS DISCUSSED. AFTER AN INITIAL CONSIDERATION OF THE VARIOUS POSSIBLE CONFIGURATIONS, NOTE IS MADE OF THE USE OF PART-TIME, WITH-FLOW BUS LANES AND STANDARDS OF LANE WIDTHS AND TRAFFIC FLOW THAT HAVE BEEN ESTABLISHED ARE SET OUT. PEDESTRIAN AND SERVICING FACILITIES ARE DISCUSSED. SOME INTERESTING SCHEMES EITHER IN OPERATION OR SHORTLY TO BE IMPLEMENTED, AND FURTHER IDEAS UNDER CONSIDERATION ARE DESCRIBED. IN CONCLUSION, THE RANGE OF COSTS AND EXPECTED BENEFITS ARE GIVEN IN BROAD TERMS. /IRRD/

Key concepts: Bus priority, Transport engineering, Traffic flow (computer networking), Range (aeronautics), Pedestrian, Computer science, Public transport, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
BUS PRIORITY IN GREATER LONDON. 3. DEVELOPMENT OF BUS LANE SCHEMES — Research Paper | ScholarLens