1966•Quarterly Report of RTRIOpen access

DATA HANDLING MACHINE FOR THE NO. 2 TRACK INSPECTION CAR OF THE NEW TOKAIDO LINE

Ippei Nakamura, Kouichi Wada

Open full text 0 citations

Abstract

To make some maintenance plans from the results of measurement of track irregularities, some statistical treatment of data becomes necessary. For this purpose a high performance electronic data handling machine was installed to the No. 1 track inspection car of the new Tokaido Line. In the case of periodical maintenance of the No. 1 track inspection car, the No. 2 inspection car is to be used.

About this research paper

What this paper is about

To make some maintenance plans from the results of measurement of track irregularities, some statistical treatment of data becomes necessary. For this purpose a high performance electronic data handling machine was installed to the No. 1 track inspection car of the new Tokaido Line. In the case of periodical maintenance of the No. 1 track inspection car, the No. 2 inspection car is to be used.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To make some maintenance plans from the results of measurement of track irregularities, some statistical treatment of data becomes necessary. For this purpose a high performance electronic data handling machine was installed to the No. 1 track inspection car of the new Tokaido Line. In the case of periodical maintenance of the No. 1 track inspection car, the No. 2 inspection car is to be used.

Key concepts: Track (disk drive), Line (geometry), Automotive engineering, Engineering, Railway line, Computer science, Reliability engineering, Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
DATA HANDLING MACHINE FOR THE NO. 2 TRACK INSPECTION CAR OF THE NEW TOKAIDO LINE — Research Paper | ScholarLens