QR ORDERS NEW TRAINS IN GROUNDBREAKING DEAL
I Hammond
Abstract
I Hammond
Abstract
In Australia, Queensland Rail's long-distance service between Brisbane and Cairns, a 1600 km trip, will be cut by 5 hours to 26 hours by a combination of higher speeds and a $A 240 million track upgrading project. The trains are diesel hydraulic tilting trains that have a top operating speed of 160 km/h. The trains are under construction and the schedule calls for service to begin in late 2002.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In Australia, Queensland Rail's long-distance service between Brisbane and Cairns, a 1600 km trip, will be cut by 5 hours to 26 hours by a combination of higher speeds and a $A 240 million track upgrading project. The trains are diesel hydraulic tilting trains that have a top operating speed of 160 km/h. The trains are under construction and the schedule calls for service to begin in late 2002.
Key concepts: Train, Schedule, Transport engineering, Service (business), Track (disk drive), Freight trains, Engineering, Telecommunications