1998•68th Annual Meeting of the Institute of Transportation EngineersInstitute of Transportation Engineers (ITE)Requires access

CLOSING A MAJOR URBAN FREEWAY WITH MINIMAL TRAFFIC CONGESTION

Gerald Robbins, John Billheimer, Doug Sibley

Open publisher page 1 citations

Abstract

In mid-1996, the City of San Francisco and the California Department of Transportation (Caltrans) were faced with the problem of having to completely close a one-half mile section of the heavily traveled Central Freeway for a six-month period. This paper summarizes the efforts made by these two agencies to accommodate Central Freeway traffic on alternate routes, and describes the wide range of traffic mitigation and public outreach strategies which contributed to minimizing the traffic impacts of this freeway closure.

About this research paper

What this paper is about

In mid-1996, the City of San Francisco and the California Department of Transportation (Caltrans) were faced with the problem of having to completely close a one-half mile section of the heavily traveled Central Freeway for a six-month period. This paper summarizes the efforts made by these two agencies to accommodate Central Freeway traffic on alternate routes, and describes the wide range of traffic mitigation and public outreach strategies which contributed to minimizing the traffic impacts of this freeway closure.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In mid-1996, the City of San Francisco and the California Department of Transportation (Caltrans) were faced with the problem of having to completely close a one-half mile section of the heavily traveled Central Freeway for a six-month period. This paper summarizes the efforts made by these two agencies to accommodate Central Freeway traffic on alternate routes, and describes the wide range of traffic mitigation and public outreach strategies which contributed to minimizing the traffic impacts of this freeway closure.

Key concepts: Transport engineering, Traffic congestion, Closing (real estate), Mile, Outreach, Public transport, Engineering, Geography

Related papers

Back to paper searchBrowse research topicsOriginal source
CLOSING A MAJOR URBAN FREEWAY WITH MINIMAL TRAFFIC CONGESTION — Research Paper | ScholarLens