BERLIN TUNNELLING TOWARDS 2002
M Page
Abstract
M Page
Abstract
The rebuilding of Potsdamer Platz and Potsdamer Street in Berlin is the largest city centre construction project in Western Europe. The pre-1939 rail and road transport scheme for Berlin will be realised with some modifications. This article describes the principal engineering works, which will be a new north-south railway and trunk road, much of which will be in tunnels. Existing U-Bahn (metro) and tram routes will be extended, to form an integrated transport system. The construction of the railway tunnels and stations will cost about $2.6BN, of which the state government will contribute about $1.7BN and German railways (DB) about $0.9BN. There will be a 3.5km route length of four single-track railway tunnels, of which about 1.2km will be machine bored. The slurry shield tunnel boring machines (TBMs) will drive through mostly water-saturated sands with layers of marls, clays, silts, and boulders. Lehrter Station will be an interchange with four levels, including street level. It will be constructed in a box, composed of slurry diaphragm walls and an underwater concrete floor, which will be held down by concreted anchors; the water will then be pumped out to finish the station works. Construction began in October 1995, and the new north-south railway is scheduled to open in May 2002.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The rebuilding of Potsdamer Platz and Potsdamer Street in Berlin is the largest city centre construction project in Western Europe. The pre-1939 rail and road transport scheme for Berlin will be realised with some modifications. This article describes the principal engineering works, which will be a new north-south railway and trunk road, much of which will be in tunnels. Existing U-Bahn (metro) and tram routes will be extended, to form an integrated transport system. The construction of the railway tunnels and stations will cost about $2.6BN, of which the state government will contribute about $1.7BN and German railways (DB) about $0.9BN. There will be a 3.5km route length of four single-track railway tunnels, of which about 1.2km will be machine bored. The slurry shield tunnel boring machines (TBMs) will drive through mostly water-saturated sands with layers of marls, clays, silts, and boulders. Lehrter Station will be an interchange with four levels, including street level. It will be constructed in a box, composed of slurry diaphragm walls and an underwater concrete floor, which will be held down by concreted anchors; the water will then be pumped out to finish the station works. Construction began in October 1995, and the new north-south railway is scheduled to open in May 2002.
Key concepts: Engineering, Track (disk drive), Civil engineering, Train, Cofferdam, Mining engineering, Archaeology, Mechanical engineering