BERLIN TUNNELLING TOWARDS 2002

M Page

Open publisher page 0 citations

Abstract

The rebuilding of Potsdamer Platz and Potsdamer Street in Berlin is the largest city centre construction project in Western Europe. The pre-1939 rail and road transport scheme for Berlin will be realised with some modifications. This article describes the principal engineering works, which will be a new north-south railway and trunk road, much of which will be in tunnels. Existing U-Bahn (metro) and tram routes will be extended, to form an integrated transport system. The construction of the railway tunnels and stations will cost about $2.6BN, of which the state government will contribute about $1.7BN and German railways (DB) about $0.9BN. There will be a 3.5km route length of four single-track railway tunnels, of which about 1.2km will be machine bored. The slurry shield tunnel boring machines (TBMs) will drive through mostly water-saturated sands with layers of marls, clays, silts, and boulders. Lehrter Station will be an interchange with four levels, including street level. It will be constructed in a box, composed of slurry diaphragm walls and an underwater concrete floor, which will be held down by concreted anchors; the water will then be pumped out to finish the station works. Construction began in October 1995, and the new north-south railway is scheduled to open in May 2002.

About this research paper

What this paper is about

The rebuilding of Potsdamer Platz and Potsdamer Street in Berlin is the largest city centre construction project in Western Europe. The pre-1939 rail and road transport scheme for Berlin will be realised with some modifications. This article describes the principal engineering works, which will be a new north-south railway and trunk road, much of which will be in tunnels. Existing U-Bahn (metro) and tram routes will be extended, to form an integrated transport system. The construction of the railway tunnels and stations will cost about $2.6BN, of which the state government will contribute about $1.7BN and German railways (DB) about $0.9BN. There will be a 3.5km route length of four single-track railway tunnels, of which about 1.2km will be machine bored. The slurry shield tunnel boring machines (TBMs) will drive through mostly water-saturated sands with layers of marls, clays, silts, and boulders. Lehrter Station will be an interchange with four levels, including street level. It will be constructed in a box, composed of slurry diaphragm walls and an underwater concrete floor, which will be held down by concreted anchors; the water will then be pumped out to finish the station works. Construction began in October 1995, and the new north-south railway is scheduled to open in May 2002.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The rebuilding of Potsdamer Platz and Potsdamer Street in Berlin is the largest city centre construction project in Western Europe. The pre-1939 rail and road transport scheme for Berlin will be realised with some modifications. This article describes the principal engineering works, which will be a new north-south railway and trunk road, much of which will be in tunnels. Existing U-Bahn (metro) and tram routes will be extended, to form an integrated transport system. The construction of the railway tunnels and stations will cost about $2.6BN, of which the state government will contribute about $1.7BN and German railways (DB) about $0.9BN. There will be a 3.5km route length of four single-track railway tunnels, of which about 1.2km will be machine bored. The slurry shield tunnel boring machines (TBMs) will drive through mostly water-saturated sands with layers of marls, clays, silts, and boulders. Lehrter Station will be an interchange with four levels, including street level. It will be constructed in a box, composed of slurry diaphragm walls and an underwater concrete floor, which will be held down by concreted anchors; the water will then be pumped out to finish the station works. Construction began in October 1995, and the new north-south railway is scheduled to open in May 2002.

Key concepts: Engineering, Track (disk drive), Civil engineering, Train, Cofferdam, Mining engineering, Archaeology, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
BERLIN TUNNELLING TOWARDS 2002 — Research Paper | ScholarLens