NATM SUBWAY STATION IN SOFT GROUND

Prakash M Donde, Hanns Wagner

Open publisher page 2 citations

Abstract

Washington Metro is on the verge of completing the construction of the first NATM subway station and tunnels in soft ground in the United States of America. The station, Fort Totten Station, and tunnels located in Washington, D.C. on the Greenbelt Route were constructed using the New Austrian Tunnelling Method (NATM). The design of the station and tunnels was performed by the authors in compliance with the U.S. design codes. The construction contract for the station and tunnels was advertised giving contractors an option to bid on either conventional tunnels and cut-and-cover station or NATM tunnels and NATM station. The NATM construction alternative came in as a low bid at $48.7 million, saving approximately $1.8 million over the conventional option for the Washington Metropolitan Area Transit Authority. This paper follows the developments from the design through the construction of the NATM station. For the covering abstract see ITRD E108195.

About this research paper

What this paper is about

Washington Metro is on the verge of completing the construction of the first NATM subway station and tunnels in soft ground in the United States of America. The station, Fort Totten Station, and tunnels located in Washington, D.C. on the Greenbelt Route were constructed using the New Austrian Tunnelling Method (NATM). The design of the station and tunnels was performed by the authors in compliance with the U.S. design codes. The construction contract for the station and tunnels was advertised giving contractors an option to bid on either conventional tunnels and cut-and-cover station or NATM tunnels and NATM station. The NATM construction alternative came in as a low bid at $48.7 million, saving approximately $1.8 million over the conventional option for the Washington Metropolitan Area Transit Authority. This paper follows the developments from the design through the construction of the NATM station. For the covering abstract see ITRD E108195.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Washington Metro is on the verge of completing the construction of the first NATM subway station and tunnels in soft ground in the United States of America. The station, Fort Totten Station, and tunnels located in Washington, D.C. on the Greenbelt Route were constructed using the New Austrian Tunnelling Method (NATM). The design of the station and tunnels was performed by the authors in compliance with the U.S. design codes. The construction contract for the station and tunnels was advertised giving contractors an option to bid on either conventional tunnels and cut-and-cover station or NATM tunnels and NATM station. The NATM construction alternative came in as a low bid at $48.7 million, saving approximately $1.8 million over the conventional option for the Washington Metropolitan Area Transit Authority. This paper follows the developments from the design through the construction of the NATM station. For the covering abstract see ITRD E108195.

Key concepts: New Austrian Tunnelling method, Subway station, Engineering, Metropolitan area, Metro station, Civil engineering, Transport engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
NATM SUBWAY STATION IN SOFT GROUND — Research Paper | ScholarLens