AN ANALYSIS OF SHORT-TERM IMPLEMENTATION OF RAMP CONTROL ON THE DAN RYAN EXPRESSWAY

Roy D Fonda

Open publisher page 7 citations

Abstract

A RAMP METERING STUDY WAS CONDUCTED ON THE NORTHBOUND DAN RYAN EXPRESSWAY TO GAIN KNOWLEDGE OF RELATIVE EFFECTS OF VARIOUS GEOMETRIC DESIGN FEATURES ON RAMP CONTROL. AN INTERPLAY BETWEEN THE EXPRESSWAY AND FRONTAGE STREET RESULTED IN THE GENERATION OF EXCEEDINGLY HIGH ENTRANCE RAMP DEMANDS AT THE POINT WHERE THE EXPRESSWAY CURVES AWAY FROM THE FRONTAGE STREET. RAMP CONTROL, IN THE FORM OF ONE-VEHICLE-AT-A-TIME METERING UTILIZING MANUALLY-OPERATED PORTABLE EQUIPMENT, WAS USED ON FOUR SUCCESSIVE ENTRANCE RAMPS TO ADJUST MERGE DEMANDS TO A LEVEL THAT COULD BE ACCOMMODATED. CONTROL OF THE FOUR ENTRANCE RAMPS DID NOT ELIMINATE CONGESTION, BUT SIGNIFICANTLY REDUCED THE EXTENT AND DURATION. THE SEVERITY OF CONGESTION WAS REDUCED SUCH THAT INDIVIDUAL MOTORISTS SAVED UP TO 5 MINUTES IN TRAVERSING THE 3.6-MILE STUDY SECTION. A DAILY AVERAGE OF 627 VEHICLE HOURS OF EXPRESSWAY TRAVEL TIME WAS SAVED DURING CONTROL, WHILE THE PEAK-PERIOD VEHICLE-MILES OF EXPRESSWAY TRAVEL INCREASED BY 5 PERCENT. DELAYS INCURRED WERE AT THE EXPENSE OF VEHICLES WAITING IN QUEUES AT THE CONTROLLED RAMPS. THERE WAS NEGLIGIBLE DELAY TO SURFACE STREET TRAFFIC IN THE CORRIDOR. RAMP METERING AT THE FOUR RAMPS DID NOT PRODUCE ENOUGH DIVERSION TO DOWNSTREAM RAMPS AND/OR SURFACE STREET ROUTES TO COMPLETELY PREVENT EXPRESSWAY OVERLOADING FROM OCCURRING IN THE STUDY SECTION, BUT SHIFTED THE POINT OF INITIAL OVERLOADING UPSTREAM. THE STUDY POINTS OUT THE NEED TO EXTEND CONTROL TO ADDITIONAL UPSTREAM ENTRANCE RAMPS AND TO ADJUST THE LEVEL OF CONTROL ON A TRAFFIC-ACTUATED BASIS IN ORDER TO FURTHER IMPROVE EXPRESSWAY OPERATIONS.

About this research paper

What this paper is about

A RAMP METERING STUDY WAS CONDUCTED ON THE NORTHBOUND DAN RYAN EXPRESSWAY TO GAIN KNOWLEDGE OF RELATIVE EFFECTS OF VARIOUS GEOMETRIC DESIGN FEATURES ON RAMP CONTROL. AN INTERPLAY BETWEEN THE EXPRESSWAY AND FRONTAGE STREET RESULTED IN THE GENERATION OF EXCEEDINGLY HIGH ENTRANCE RAMP DEMANDS AT THE POINT WHERE THE EXPRESSWAY CURVES AWAY FROM THE FRONTAGE STREET. RAMP CONTROL, IN THE FORM OF ONE-VEHICLE-AT-A-TIME METERING UTILIZING MANUALLY-OPERATED PORTABLE EQUIPMENT, WAS USED ON FOUR SUCCESSIVE ENTRANCE RAMPS TO ADJUST MERGE DEMANDS TO A LEVEL THAT COULD BE ACCOMMODATED. CONTROL OF THE FOUR ENTRANCE RAMPS DID NOT ELIMINATE CONGESTION, BUT SIGNIFICANTLY REDUCED THE EXTENT AND DURATION. THE SEVERITY OF CONGESTION WAS REDUCED SUCH THAT INDIVIDUAL MOTORISTS SAVED UP TO 5 MINUTES IN TRAVERSING THE 3.6-MILE STUDY SECTION. A DAILY AVERAGE OF 627 VEHICLE HOURS OF EXPRESSWAY TRAVEL TIME WAS SAVED DURING CONTROL, WHILE THE PEAK-PERIOD VEHICLE-MILES OF EXPRESSWAY TRAVEL INCREASED BY 5 PERCENT. DELAYS INCURRED WERE AT THE EXPENSE OF VEHICLES WAITING IN QUEUES AT THE CONTROLLED RAMPS. THERE WAS NEGLIGIBLE DELAY TO SURFACE STREET TRAFFIC IN THE CORRIDOR. RAMP METERING AT THE FOUR RAMPS DID NOT PRODUCE ENOUGH DIVERSION TO DOWNSTREAM RAMPS AND/OR SURFACE STREET ROUTES TO COMPLETELY PREVENT EXPRESSWAY OVERLOADING FROM OCCURRING IN THE STUDY SECTION, BUT SHIFTED THE POINT OF INITIAL OVERLOADING UPSTREAM. THE STUDY POINTS OUT THE NEED TO EXTEND CONTROL TO ADDITIONAL UPSTREAM ENTRANCE RAMPS AND TO ADJUST THE LEVEL OF CONTROL ON A TRAFFIC-ACTUATED BASIS IN ORDER TO FURTHER IMPROVE EXPRESSWAY OPERATIONS.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A RAMP METERING STUDY WAS CONDUCTED ON THE NORTHBOUND DAN RYAN EXPRESSWAY TO GAIN KNOWLEDGE OF RELATIVE EFFECTS OF VARIOUS GEOMETRIC DESIGN FEATURES ON RAMP CONTROL. AN INTERPLAY BETWEEN THE EXPRESSWAY AND FRONTAGE STREET RESULTED IN THE GENERATION OF EXCEEDINGLY HIGH ENTRANCE RAMP DEMANDS AT THE POINT WHERE THE EXPRESSWAY CURVES AWAY FROM THE FRONTAGE STREET. RAMP CONTROL, IN THE FORM OF ONE-VEHICLE-AT-A-TIME METERING UTILIZING MANUALLY-OPERATED PORTABLE EQUIPMENT, WAS USED ON FOUR SUCCESSIVE ENTRANCE RAMPS TO ADJUST MERGE DEMANDS TO A LEVEL THAT COULD BE ACCOMMODATED. CONTROL OF THE FOUR ENTRANCE RAMPS DID NOT ELIMINATE CONGESTION, BUT SIGNIFICANTLY REDUCED THE EXTENT AND DURATION. THE SEVERITY OF CONGESTION WAS REDUCED SUCH THAT INDIVIDUAL MOTORISTS SAVED UP TO 5 MINUTES IN TRAVERSING THE 3.6-MILE STUDY SECTION. A DAILY AVERAGE OF 627 VEHICLE HOURS OF EXPRESSWAY TRAVEL TIME WAS SAVED DURING CONTROL, WHILE THE PEAK-PERIOD VEHICLE-MILES OF EXPRESSWAY TRAVEL INCREASED BY 5 PERCENT. DELAYS INCURRED WERE AT THE EXPENSE OF VEHICLES WAITING IN QUEUES AT THE CONTROLLED RAMPS. THERE WAS NEGLIGIBLE DELAY TO SURFACE STREET TRAFFIC IN THE CORRIDOR. RAMP METERING AT THE FOUR RAMPS DID NOT PRODUCE ENOUGH DIVERSION TO DOWNSTREAM RAMPS AND/OR SURFACE STREET ROUTES TO COMPLETELY PREVENT EXPRESSWAY OVERLOADING FROM OCCURRING IN THE STUDY SECTION, BUT SHIFTED THE POINT OF INITIAL OVERLOADING UPSTREAM. THE STUDY POINTS OUT THE NEED TO EXTEND CONTROL TO ADDITIONAL UPSTREAM ENTRANCE RAMPS AND TO ADJUST THE LEVEL OF CONTROL ON A TRAFFIC-ACTUATED BASIS IN ORDER TO FURTHER IMPROVE EXPRESSWAY OPERATIONS.

Key concepts: Metering mode, Merge (version control), Traverse, Upstream (networking), Transport engineering, Engineering, Queue, Automotive engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
AN ANALYSIS OF SHORT-TERM IMPLEMENTATION OF RAMP CONTROL ON THE DAN RYAN EXPRESSWAY — Research Paper | ScholarLens