The Milton-Madison Bridge, a 3,181 ft long cantilever through truss structure, spans the Ohio River to link Milton, Kentucky and Madison, Indiana. The 81-year-old bridge is being replaced using an innovative design and construction approach to fully rehabilitate the bridge. This method entails building a new superstructure downstream of the existing bridge and then sliding it onto the existing rehabilitated piers. The bridge replacement will require only 10 days of closure to traffic.

About this research paper

What this paper is about

The Milton-Madison Bridge, a 3,181 ft long cantilever through truss structure, spans the Ohio River to link Milton, Kentucky and Madison, Indiana. The 81-year-old bridge is being replaced using an innovative design and construction approach to fully rehabilitate the bridge. This method entails building a new superstructure downstream of the existing bridge and then sliding it onto the existing rehabilitated piers. The bridge replacement will require only 10 days of closure to traffic.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Milton-Madison Bridge, a 3,181 ft long cantilever through truss structure, spans the Ohio River to link Milton, Kentucky and Madison, Indiana. The 81-year-old bridge is being replaced using an innovative design and construction approach to fully rehabilitate the bridge. This method entails building a new superstructure downstream of the existing bridge and then sliding it onto the existing rehabilitated piers. The bridge replacement will require only 10 days of closure to traffic.

Key concepts: Bridge (graph theory), Truss, Truss bridge, Engineering, Closure (psychology), Pier, Structural engineering, Cantilever