PUBLIC TRANSPORT IN LONDON DOCKLANDS: THE CHICKEN OR THE EGG?

Cameron Grant, R Paling

Open publisher page 2 citations

Abstract

This article looks at the changes which have taken place in London's Docklands area since 1981, and the ways in which the provision of a public transport infrastructure and the enormous scale of development have stimulated each other, producing further growth in transport demand. A number of transport projects are considered: (1) the Docklands Light Railway (DLR), which originally was planned to link the Isle of Dogs to Central London and Stratford. Capacity in early 1990 was about 1600 passengers/hour per direction on each branch; this will increase in July 1990 to 3000 passengers/hour on the City branch when double length trains are introduced, and this line's ultimate capacity is now planned to be 12000 passengers/hour; (2) in response to developments at Canary Wharf creating further transport demand, the new Jubilee Line extension is scheduled to begin construction in 1991, for completion in 1995; this line will link the Isle of Dogs with Waterloo; (3) a southern extension of the DLR has been designed, with links to Greenwich and Lewisham, connecting to British Rail North Kent services; (4) at the Royal Docks a DLR link is planned to Beckton, together with a new internal road network this will improve good transport links and provide for future demand; (5) bus services are seen in short term supplementary role until the opening of the Jubilee Line extension.

About this research paper

What this paper is about

This article looks at the changes which have taken place in London's Docklands area since 1981, and the ways in which the provision of a public transport infrastructure and the enormous scale of development have stimulated each other, producing further growth in transport demand. A number of transport projects are considered: (1) the Docklands Light Railway (DLR), which originally was planned to link the Isle of Dogs to Central London and Stratford. Capacity in early 1990 was about 1600 passengers/hour per direction on each branch; this will increase in July 1990 to 3000 passengers/hour on the City branch when double length trains are introduced, and this line's ultimate capacity is now planned to be 12000 passengers/hour; (2) in response to developments at Canary Wharf creating further transport demand, the new Jubilee Line extension is scheduled to begin construction in 1991, for completion in 1995; this line will link the Isle of Dogs with Waterloo; (3) a southern extension of the DLR has been designed, with links to Greenwich and Lewisham, connecting to British Rail North Kent services; (4) at the Royal Docks a DLR link is planned to Beckton, together with a new internal road network this will improve good transport links and provide for future demand; (5) bus services are seen in short term supplementary role until the opening of the Jubilee Line extension.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article looks at the changes which have taken place in London's Docklands area since 1981, and the ways in which the provision of a public transport infrastructure and the enormous scale of development have stimulated each other, producing further growth in transport demand. A number of transport projects are considered: (1) the Docklands Light Railway (DLR), which originally was planned to link the Isle of Dogs to Central London and Stratford. Capacity in early 1990 was about 1600 passengers/hour per direction on each branch; this will increase in July 1990 to 3000 passengers/hour on the City branch when double length trains are introduced, and this line's ultimate capacity is now planned to be 12000 passengers/hour; (2) in response to developments at Canary Wharf creating further transport demand, the new Jubilee Line extension is scheduled to begin construction in 1991, for completion in 1995; this line will link the Isle of Dogs with Waterloo; (3) a southern extension of the DLR has been designed, with links to Greenwich and Lewisham, connecting to British Rail North Kent services; (4) at the Royal Docks a DLR link is planned to Beckton, together with a new internal road network this will improve good transport links and provide for future demand; (5) bus services are seen in short term supplementary role until the opening of the Jubilee Line extension.

Key concepts: Greenwich, Public transport, Train, Wharf, Transport engineering, City centre, Passenger transport, Telecommunications