CONSTRUCTION OF TUNNELS WITH HORIZONTALLY STEERED SHIELD DRILL : TECHNIQUE FOR DRIVING LARGE GALLERIES UNDERGROUND

F Brink

Open publisher page 0 citations

Abstract

For driving tunnels in weak soils a number of drilling-techniques have been developed. One of these is the shield method: a drill head (the shield) is thrusted horizontally through the ground, excavating soil on the front side of the head, while the tunnel is being constructed at the rear. With the shield method tunnels with large diameters can be constructed. This article considers the principle of the shield method, in which various techniques for controlling the ground water and the excavation process are discussed. To construct the tunnel wall simple segments of high-quality concrete are mostly used nowadays. This is cheaper than the formerly used double wall system (inner and outer lining). Finally the assessment of the depth position of the shield tunnel is briefly discussed. (TRRL)

About this research paper

What this paper is about

For driving tunnels in weak soils a number of drilling-techniques have been developed. One of these is the shield method: a drill head (the shield) is thrusted horizontally through the ground, excavating soil on the front side of the head, while the tunnel is being constructed at the rear. With the shield method tunnels with large diameters can be constructed. This article considers the principle of the shield method, in which various techniques for controlling the ground water and the excavation process are discussed. To construct the tunnel wall simple segments of high-quality concrete are mostly used nowadays. This is cheaper than the formerly used double wall system (inner and outer lining). Finally the assessment of the depth position of the shield tunnel is briefly discussed. (TRRL)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

For driving tunnels in weak soils a number of drilling-techniques have been developed. One of these is the shield method: a drill head (the shield) is thrusted horizontally through the ground, excavating soil on the front side of the head, while the tunnel is being constructed at the rear. With the shield method tunnels with large diameters can be constructed. This article considers the principle of the shield method, in which various techniques for controlling the ground water and the excavation process are discussed. To construct the tunnel wall simple segments of high-quality concrete are mostly used nowadays. This is cheaper than the formerly used double wall system (inner and outer lining). Finally the assessment of the depth position of the shield tunnel is briefly discussed. (TRRL)

Key concepts: Shield, Drill, Excavation, Drilling, Head (geology), Geotechnical engineering, Geology, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
CONSTRUCTION OF TUNNELS WITH HORIZONTALLY STEERED SHIELD DRILL : TECHNIQUE FOR DRIVING LARGE GALLERIES UNDERGROUND — Research Paper | ScholarLens