EASE/ACCESS ground processing at Kennedy Space Center

Deborah J. Moates, Ana M. Villamil Giraldo

Open publisher page 0 citations

Abstract

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

About this research paper

What this paper is about

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Key concepts: Payload (computing), Orbiter, Space Shuttle, Engineering, Aeronautics, Systems engineering, Process (computing), Space (punctuation)

Related papers

Back to paper searchBrowse research topicsOriginal source
EASE/ACCESS ground processing at Kennedy Space Center — Research Paper | ScholarLens