1998ARRB TRANSPORT RESEARCH LTD CONFERENCE, 19TH, 1998, SYDNEY, NEW SOUTH WALES, AUSTRALIARequires access

RISK ISSUES IN PERFORMANCE-SPECIFIED FLEXIBLE PAVING CONTRACTS

P J Gallagher, D Mangan

Open publisher page 3 citations

Abstract

It is widely accepted that true performance specifications are a pipe dream while there are no adequate performance models of pavement behavior. In the United States, the SHRP Superpave performance prediction model was found to have significant technical problems which have prompted a review that will not be completed until the year 2005. Despite the technological limitations, there has been a strong response to a number of design, construct and maintain (DCM) contracts in NSW which require a 10 year pavement warranty. The 1997 Federal inquiry into road funding espoused the economic benefits of DCM and similar long-term warranty contracts. This paper explores the current limitations of knowledge and technology which need to be appreciated in assuming the risks of performance specified paving works. It also examines some particular risks which will need further consideration before this form of contracting is extended to pavement rehabilitation contracts. (a) For the covering entry of this conference, please see IRRD abstract no. 492019.

About this research paper

What this paper is about

It is widely accepted that true performance specifications are a pipe dream while there are no adequate performance models of pavement behavior. In the United States, the SHRP Superpave performance prediction model was found to have significant technical problems which have prompted a review that will not be completed until the year 2005. Despite the technological limitations, there has been a strong response to a number of design, construct and maintain (DCM) contracts in NSW which require a 10 year pavement warranty. The 1997 Federal inquiry into road funding espoused the economic benefits of DCM and similar long-term warranty contracts. This paper explores the current limitations of knowledge and technology which need to be appreciated in assuming the risks of performance specified paving works. It also examines some particular risks which will need further consideration before this form of contracting is extended to pavement rehabilitation contracts. (a) For the covering entry of this conference, please see IRRD abstract no. 492019.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It is widely accepted that true performance specifications are a pipe dream while there are no adequate performance models of pavement behavior. In the United States, the SHRP Superpave performance prediction model was found to have significant technical problems which have prompted a review that will not be completed until the year 2005. Despite the technological limitations, there has been a strong response to a number of design, construct and maintain (DCM) contracts in NSW which require a 10 year pavement warranty. The 1997 Federal inquiry into road funding espoused the economic benefits of DCM and similar long-term warranty contracts. This paper explores the current limitations of knowledge and technology which need to be appreciated in assuming the risks of performance specified paving works. It also examines some particular risks which will need further consideration before this form of contracting is extended to pavement rehabilitation contracts. (a) For the covering entry of this conference, please see IRRD abstract no. 492019.

Key concepts: Warranty, Risk analysis (engineering), Engineering, Term (time), Actuarial science, Transport engineering, Business, Law

Related papers

Back to paper searchBrowse research topicsOriginal source
RISK ISSUES IN PERFORMANCE-SPECIFIED FLEXIBLE PAVING CONTRACTS — Research Paper | ScholarLens