1984Unpublished venueRequires access

An approach to the assessment of the effects of alternative future road funding levels

R T Underwood

Open publisher page 0 citations

Abstract

This paper describes a recently completed study of all Australian roads in which the approach was to estimate the future physical and travel conditions on the road system, and the cost of transportation on it, for different levels of future funding. The paper describes the procedures and techniques used in the study. The first step was to describe the base year situation which involved the collection and analysis of data on specific issues, on road and bridge inventory, on traffic and traffic service measures and on road and bridge work output and expenditure. Alternative future funding levels for analysis were then selected, and future management (expenditure) strategies for each of these levels were developed. The effects of the alternative future funding levels on the road system and on travel on it over a 10 year analysis period were then analysed. The techniques included the use of a computer based planning model for rural arterial roads using data from a series of coordinated data banks, the application of transport planning and road inventory based analyses for urban arterial roads, and sampling procedures for local roads. The study was documented in detail (a).

About this research paper

What this paper is about

This paper describes a recently completed study of all Australian roads in which the approach was to estimate the future physical and travel conditions on the road system, and the cost of transportation on it, for different levels of future funding. The paper describes the procedures and techniques used in the study. The first step was to describe the base year situation which involved the collection and analysis of data on specific issues, on road and bridge inventory, on traffic and traffic service measures and on road and bridge work output and expenditure. Alternative future funding levels for analysis were then selected, and future management (expenditure) strategies for each of these levels were developed. The effects of the alternative future funding levels on the road system and on travel on it over a 10 year analysis period were then analysed. The techniques included the use of a computer based planning model for rural arterial roads using data from a series of coordinated data banks, the application of transport planning and road inventory based analyses for urban arterial roads, and sampling procedures for local roads. The study was documented in detail (a).

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper describes a recently completed study of all Australian roads in which the approach was to estimate the future physical and travel conditions on the road system, and the cost of transportation on it, for different levels of future funding. The paper describes the procedures and techniques used in the study. The first step was to describe the base year situation which involved the collection and analysis of data on specific issues, on road and bridge inventory, on traffic and traffic service measures and on road and bridge work output and expenditure. Alternative future funding levels for analysis were then selected, and future management (expenditure) strategies for each of these levels were developed. The effects of the alternative future funding levels on the road system and on travel on it over a 10 year analysis period were then analysed. The techniques included the use of a computer based planning model for rural arterial roads using data from a series of coordinated data banks, the application of transport planning and road inventory based analyses for urban arterial roads, and sampling procedures for local roads. The study was documented in detail (a).

Key concepts: Transport engineering, Work (physics), Data collection, Bridge (graph theory), Road transport, Transportation planning, Business, Operations research

Related papers

Back to paper searchBrowse research topicsOriginal source
An approach to the assessment of the effects of alternative future road funding levels — Research Paper | ScholarLens