MARTA GETS MOVING, AT LAST
Joseph Asher
Abstract
Joseph Asher
Abstract
Construction has started on the Metropolitan Atlanta Rapid Transit system. This article describes the long planning and political processes which preceded the building of the system that is eventually to extend 60.9 miles, cost $2.1 billion and require more than 330 cars.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Construction has started on the Metropolitan Atlanta Rapid Transit system. This article describes the long planning and political processes which preceded the building of the system that is eventually to extend 60.9 miles, cost $2.1 billion and require more than 330 cars.
Key concepts: Atlanta, Metropolitan area, Rapid transit, Transit (satellite), Transport engineering, Transit system, Light rail transit, Rail transit