1975Railway ageRequires access

MARTA GETS MOVING, AT LAST

Joseph Asher

Open publisher page 0 citations

Abstract

Construction has started on the Metropolitan Atlanta Rapid Transit system. This article describes the long planning and political processes which preceded the building of the system that is eventually to extend 60.9 miles, cost $2.1 billion and require more than 330 cars.

About this research paper

What this paper is about

Construction has started on the Metropolitan Atlanta Rapid Transit system. This article describes the long planning and political processes which preceded the building of the system that is eventually to extend 60.9 miles, cost $2.1 billion and require more than 330 cars.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction has started on the Metropolitan Atlanta Rapid Transit system. This article describes the long planning and political processes which preceded the building of the system that is eventually to extend 60.9 miles, cost $2.1 billion and require more than 330 cars.

Key concepts: Atlanta, Metropolitan area, Rapid transit, Transit (satellite), Transport engineering, Transit system, Light rail transit, Rail transit

Related papers

Back to paper searchBrowse research topicsOriginal source
MARTA GETS MOVING, AT LAST — Research Paper | ScholarLens