TRACK MAINTENANCE FOR HIGH-SPEED TRAINS
H H Jenkins
Abstract
H H Jenkins
Abstract
To prepare its mainlines for high-speed trains, British Railways has made changes in track structures and track maintenance. Evolution to the present design of concrete cross tie and rail fasteners is described, and the conversion to welded rail is discussed. The depth of ballast was increased and the quality standards improved. The maintenance machines and maintenance techniques have also been altered. Brief mention is made of glued joints, rail welding, manual/mechanized ballast packing, rail drilling and sawing, and rail destressing and restressing.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
To prepare its mainlines for high-speed trains, British Railways has made changes in track structures and track maintenance. Evolution to the present design of concrete cross tie and rail fasteners is described, and the conversion to welded rail is discussed. The depth of ballast was increased and the quality standards improved. The maintenance machines and maintenance techniques have also been altered. Brief mention is made of glued joints, rail welding, manual/mechanized ballast packing, rail drilling and sawing, and rail destressing and restressing.
Key concepts: Ballast, Train, Track (disk drive), Welding, Engineering, Marine engineering, Third rail, Automotive engineering