1976Unpublished venueRequires access

TRACK MAINTENANCE FOR HIGH-SPEED TRAINS

H H Jenkins

Open publisher page 2 citations

Abstract

To prepare its mainlines for high-speed trains, British Railways has made changes in track structures and track maintenance. Evolution to the present design of concrete cross tie and rail fasteners is described, and the conversion to welded rail is discussed. The depth of ballast was increased and the quality standards improved. The maintenance machines and maintenance techniques have also been altered. Brief mention is made of glued joints, rail welding, manual/mechanized ballast packing, rail drilling and sawing, and rail destressing and restressing.

About this research paper

What this paper is about

To prepare its mainlines for high-speed trains, British Railways has made changes in track structures and track maintenance. Evolution to the present design of concrete cross tie and rail fasteners is described, and the conversion to welded rail is discussed. The depth of ballast was increased and the quality standards improved. The maintenance machines and maintenance techniques have also been altered. Brief mention is made of glued joints, rail welding, manual/mechanized ballast packing, rail drilling and sawing, and rail destressing and restressing.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To prepare its mainlines for high-speed trains, British Railways has made changes in track structures and track maintenance. Evolution to the present design of concrete cross tie and rail fasteners is described, and the conversion to welded rail is discussed. The depth of ballast was increased and the quality standards improved. The maintenance machines and maintenance techniques have also been altered. Brief mention is made of glued joints, rail welding, manual/mechanized ballast packing, rail drilling and sawing, and rail destressing and restressing.

Key concepts: Ballast, Train, Track (disk drive), Welding, Engineering, Marine engineering, Third rail, Automotive engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
TRACK MAINTENANCE FOR HIGH-SPEED TRAINS — Research Paper | ScholarLens