Rider 36 OS/OW Vehicle Fees Study

C. Michael Walton, Lisa Loftus-Otway, Robert W. Harrison, Mike Murphy, Angela Jannini Weissmann, José Weissmann, Jolanda Prozzi, Hailin Wu, Ambarish Bannerjee, Miralynn Malupa-Kim, R.A. Hutchinson

Open publisher page 0 citations

Abstract

The Texas Legislature in Rider 36 of the 2012–2013 General Appropriations Act directed the Texas Department of Transportation (TxDOT) to conduct a study on road damage caused by oversized and overweight (OS/OW) trucks (including those currently exempt), and to provide recommendations for permit fee and fee structure adjustments to the Legislative Budget Board and the governor. The project developed methodologies to quantify pavement and bridge consumption rates per mile. In addition to the consumption rates for bridges and pavements due to the effect of axle loads, the team also identified $60 million in additional annual costs not currently addressed in permit fee calculations, such as law enforcement costs and damage to roadside appurtenances. Based on these costs and consumption rates, the researchers developed a new fee schedule that considers costs associated with oversize vehicles that exceed legal width, height, or length for 34 rate categories. These new fees were also calculated based on vehicle miles traveled (VMT). The research team also developed a model that could be used by operators to calculate their permit fees using the new fee schedule, type of vehicle, axle configurations, counties operating within, and VMT.

About this research paper

What this paper is about

The Texas Legislature in Rider 36 of the 2012–2013 General Appropriations Act directed the Texas Department of Transportation (TxDOT) to conduct a study on road damage caused by oversized and overweight (OS/OW) trucks (including those currently exempt), and to provide recommendations for permit fee and fee structure adjustments to the Legislative Budget Board and the governor. The project developed methodologies to quantify pavement and bridge consumption rates per mile. In addition to the consumption rates for bridges and pavements due to the effect of axle loads, the team also identified $60 million in additional annual costs not currently addressed in permit fee calculations, such as law enforcement costs and damage to roadside appurtenances. Based on these costs and consumption rates, the researchers developed a new fee schedule that considers costs associated with oversize vehicles that exceed legal width, height, or length for 34 rate categories. These new fees were also calculated based on vehicle miles traveled (VMT). The research team also developed a model that could be used by operators to calculate their permit fees using the new fee schedule, type of vehicle, axle configurations, counties operating within, and VMT.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Texas Legislature in Rider 36 of the 2012–2013 General Appropriations Act directed the Texas Department of Transportation (TxDOT) to conduct a study on road damage caused by oversized and overweight (OS/OW) trucks (including those currently exempt), and to provide recommendations for permit fee and fee structure adjustments to the Legislative Budget Board and the governor. The project developed methodologies to quantify pavement and bridge consumption rates per mile. In addition to the consumption rates for bridges and pavements due to the effect of axle loads, the team also identified $60 million in additional annual costs not currently addressed in permit fee calculations, such as law enforcement costs and damage to roadside appurtenances. Based on these costs and consumption rates, the researchers developed a new fee schedule that considers costs associated with oversize vehicles that exceed legal width, height, or length for 34 rate categories. These new fees were also calculated based on vehicle miles traveled (VMT). The research team also developed a model that could be used by operators to calculate their permit fees using the new fee schedule, type of vehicle, axle configurations, counties operating within, and VMT.

Key concepts: Truck, Transport engineering, Schedule, Legislature, Enforcement, Consumption (sociology), Mile, Axle

Related papers

Back to paper searchBrowse research topicsOriginal source
Rider 36 OS/OW Vehicle Fees Study — Research Paper | ScholarLens