2008•ARRB Conference, 23rd, 2008, Adelaide, South Australia, AustraliaRequires access

Overtaking process on two lane rural highways

P P Day, Shashank Chandra, S Gangopadhyay

Open publisher page 3 citations

Abstract

Two-lane roads in India comprise a very large proportion of the road network. Two-lane roads have one lane for use by traffic in each direction and the faster vehicles when approaching slower vehicles, use the opposing lane to overtake the slower vehicles depending on the sight distance available and the gaps in opposing stream. Overtaking involves lane-change manoeuvres, possibly of the acceleration and deceleration actions and estimation of relative speed of the overtaking and overtaken vehicles. Road capacity, level of service and safety are all affected by the passing (overtaking and passing are used in this paper synonymously) ability of faster vehicles. On Indian roads, size, width, speed and operational characteristics vary greatly from vehicle to vehicle. In the present study the decision rules for different types of overtaking are developed. Data collected at three different highways were analysed and the various relationships between relative speed of overtaking and overtaken vehicle and the overtaking time, required gap are also developed.

About this research paper

What this paper is about

Two-lane roads in India comprise a very large proportion of the road network. Two-lane roads have one lane for use by traffic in each direction and the faster vehicles when approaching slower vehicles, use the opposing lane to overtake the slower vehicles depending on the sight distance available and the gaps in opposing stream. Overtaking involves lane-change manoeuvres, possibly of the acceleration and deceleration actions and estimation of relative speed of the overtaking and overtaken vehicles. Road capacity, level of service and safety are all affected by the passing (overtaking and passing are used in this paper synonymously) ability of faster vehicles. On Indian roads, size, width, speed and operational characteristics vary greatly from vehicle to vehicle. In the present study the decision rules for different types of overtaking are developed. Data collected at three different highways were analysed and the various relationships between relative speed of overtaking and overtaken vehicle and the overtaking time, required gap are also developed.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Two-lane roads in India comprise a very large proportion of the road network. Two-lane roads have one lane for use by traffic in each direction and the faster vehicles when approaching slower vehicles, use the opposing lane to overtake the slower vehicles depending on the sight distance available and the gaps in opposing stream. Overtaking involves lane-change manoeuvres, possibly of the acceleration and deceleration actions and estimation of relative speed of the overtaking and overtaken vehicles. Road capacity, level of service and safety are all affected by the passing (overtaking and passing are used in this paper synonymously) ability of faster vehicles. On Indian roads, size, width, speed and operational characteristics vary greatly from vehicle to vehicle. In the present study the decision rules for different types of overtaking are developed. Data collected at three different highways were analysed and the various relationships between relative speed of overtaking and overtaken vehicle and the overtaking time, required gap are also developed.

Key concepts: Overtaking, Transport engineering, Acceleration, Process (computing), Automotive engineering, Computer science, Engineering, Operating system

Related papers

Back to paper searchBrowse research topicsOriginal source
Overtaking process on two lane rural highways — Research Paper | ScholarLens