Britain's first high-speed line, High Speed 1 (HS1), has been delivered on-budget and on-time. HS1 was opened in two sections--the longer first section opened in 2004 and connected the Channel Tunnel and Fawkham Junction. The second, newly opened section ends at London St. Pancras. Two new stations have been built between London St. Pancras and the Channel Tunnel--at Ebbsfleet and at Stratford. The latter is expected to play a key role when the 2012 Olympics are held in London. The massive required investment of more than 5 billion pounds sterling is detailed, as are operations of companies such as Eurostar.

About this research paper

What this paper is about

Britain's first high-speed line, High Speed 1 (HS1), has been delivered on-budget and on-time. HS1 was opened in two sections--the longer first section opened in 2004 and connected the Channel Tunnel and Fawkham Junction. The second, newly opened section ends at London St. Pancras. Two new stations have been built between London St. Pancras and the Channel Tunnel--at Ebbsfleet and at Stratford. The latter is expected to play a key role when the 2012 Olympics are held in London. The massive required investment of more than 5 billion pounds sterling is detailed, as are operations of companies such as Eurostar.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Britain's first high-speed line, High Speed 1 (HS1), has been delivered on-budget and on-time. HS1 was opened in two sections--the longer first section opened in 2004 and connected the Channel Tunnel and Fawkham Junction. The second, newly opened section ends at London St. Pancras. Two new stations have been built between London St. Pancras and the Channel Tunnel--at Ebbsfleet and at Stratford. The latter is expected to play a key role when the 2012 Olympics are held in London. The massive required investment of more than 5 billion pounds sterling is detailed, as are operations of companies such as Eurostar.

Key concepts: Section (typography), Channel tunnel, Channel (broadcasting), Telecommunications, Engineering, Transport engineering, Business, Advertising

Related papers

Back to paper searchBrowse research topicsOriginal source
London Plugs In With High Speed 1 — Research Paper | ScholarLens