ATTIKO METRO PREPARES TO EXPAND

F P Bassily, G J Nellas

Open publisher page 0 citations

Abstract

The initial phase of the Athens Metro in Greece will be completed in 2001. It will consist of two underground lines totalling 18 km with 20 stations. The projected daily usage of the network is 450,000 passengers. Two 6.5-km sections were opened in 2000. Project owner Attiko Metro was assisted by Bechtel International. Construction was delayed by archaeological excavations and the varying geological conditions (heterogeneous fractured schist with occurrences of Karstic limestone and peridotite). The New Austrian Tunnelling Method was used for 5% of the running tunnels and six mined stations. Cut-and-cover was used for 35% of the tunnels and the rest of the stations. The remainder of the tunnels were excavated using tunnel-boring machines. The future metro development plan is discussed. For the covering abstract see ITRD E113663.

About this research paper

What this paper is about

The initial phase of the Athens Metro in Greece will be completed in 2001. It will consist of two underground lines totalling 18 km with 20 stations. The projected daily usage of the network is 450,000 passengers. Two 6.5-km sections were opened in 2000. Project owner Attiko Metro was assisted by Bechtel International. Construction was delayed by archaeological excavations and the varying geological conditions (heterogeneous fractured schist with occurrences of Karstic limestone and peridotite). The New Austrian Tunnelling Method was used for 5% of the running tunnels and six mined stations. Cut-and-cover was used for 35% of the tunnels and the rest of the stations. The remainder of the tunnels were excavated using tunnel-boring machines. The future metro development plan is discussed. For the covering abstract see ITRD E113663.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The initial phase of the Athens Metro in Greece will be completed in 2001. It will consist of two underground lines totalling 18 km with 20 stations. The projected daily usage of the network is 450,000 passengers. Two 6.5-km sections were opened in 2000. Project owner Attiko Metro was assisted by Bechtel International. Construction was delayed by archaeological excavations and the varying geological conditions (heterogeneous fractured schist with occurrences of Karstic limestone and peridotite). The New Austrian Tunnelling Method was used for 5% of the running tunnels and six mined stations. Cut-and-cover was used for 35% of the tunnels and the rest of the stations. The remainder of the tunnels were excavated using tunnel-boring machines. The future metro development plan is discussed. For the covering abstract see ITRD E113663.

Key concepts: Excavation, Karst, Plan (archaeology), Geology, Mining engineering, Schist, Sinkhole, Archaeology

Related papers

Back to paper searchBrowse research topicsOriginal source
ATTIKO METRO PREPARES TO EXPAND — Research Paper | ScholarLens