1989Publication of: Telford (Thomas) LimitedRequires access

TAY RAIL BRIDGE CENTENARY - SOME NOTES ON ITS CONSTRUCTION 1882-87. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS

J S SHIPWAY

Open publisher page 2 citations

Abstract

This paper describes the history, design and construction of the tay railway bridge. The design and construction of the present bridge are so inextricably bound up with the failure of its predecessor in the disaster of 1879 that any description of it must begin with the story of the earlier first effort to bridge the tay. Although everyone has heard of the disaster, perhaps few know the facts of an event which seems to have gripped public imagination as no other has done since. The paper begins with a description of the design and construction of the first tay bridge, which was a few feet shorter than two miles long, by far the longest bridge in the world at that time. The events leading to its fall in a gale on 28 December 1879 are outlined, together with the findings of the public inquiry, and the new conditions set out for the construction of the present bridge. The ingenious construction methods for the new bridge, employed by the contractor, William arrol of Glasgow, are described. The construction took five years from 1882-87, and the bridge celebrated the centenary of its opening on 20 June 1987.(a)

About this research paper

What this paper is about

This paper describes the history, design and construction of the tay railway bridge. The design and construction of the present bridge are so inextricably bound up with the failure of its predecessor in the disaster of 1879 that any description of it must begin with the story of the earlier first effort to bridge the tay. Although everyone has heard of the disaster, perhaps few know the facts of an event which seems to have gripped public imagination as no other has done since. The paper begins with a description of the design and construction of the first tay bridge, which was a few feet shorter than two miles long, by far the longest bridge in the world at that time. The events leading to its fall in a gale on 28 December 1879 are outlined, together with the findings of the public inquiry, and the new conditions set out for the construction of the present bridge. The ingenious construction methods for the new bridge, employed by the contractor, William arrol of Glasgow, are described. The construction took five years from 1882-87, and the bridge celebrated the centenary of its opening on 20 June 1987.(a)

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper describes the history, design and construction of the tay railway bridge. The design and construction of the present bridge are so inextricably bound up with the failure of its predecessor in the disaster of 1879 that any description of it must begin with the story of the earlier first effort to bridge the tay. Although everyone has heard of the disaster, perhaps few know the facts of an event which seems to have gripped public imagination as no other has done since. The paper begins with a description of the design and construction of the first tay bridge, which was a few feet shorter than two miles long, by far the longest bridge in the world at that time. The events leading to its fall in a gale on 28 December 1879 are outlined, together with the findings of the public inquiry, and the new conditions set out for the construction of the present bridge. The ingenious construction methods for the new bridge, employed by the contractor, William arrol of Glasgow, are described. The construction took five years from 1882-87, and the bridge celebrated the centenary of its opening on 20 June 1987.(a)

Key concepts: Bridge (graph theory), Institution, Event (particle physics), Engineering, History, Forensic engineering, Law, Political science

Related papers

Back to paper searchBrowse research topicsOriginal source
TAY RAIL BRIDGE CENTENARY - SOME NOTES ON ITS CONSTRUCTION 1882-87. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS — Research Paper | ScholarLens