Design and construction of New Zealand War Memorial Park and underpass

Alon De Groot, S Glue, Linda Morgan

Open publisher page 0 citations

Abstract

This paper outlines the National War Memorial Park underpass and park project in Wellington New Zealand. The 15,000+m2 park is being separated from traffic by a 300 m long cut and cover trench and tunnel of which 138m is a rectangular box section tunnel. The parkrs opening will commemorate the 100th anniversary of the Anzac Gallipoli landings. To enable completion in time for Anzac Day 25 April 2015 the resource consent process of the park and underpass was expedited through the passing by the NZ Parliament of the National War Memorial Park (Pukeahu) Empowering Act 2012. Design and construction is being undertaken by an Alliance. A summary is given of the local history, project enabling legislation, park and underpass designs, ground and surface water issues, enabling works, community engagement and creche relocation. Structural and geotechnical considerations are described including earthquake responses to seismic inertia, lateral spreading and uplift. There are over 5 faults within 20 km of the site that have return periods less than 2500 years, one of which raised the nearby Basin Reserve by 1 - 1.5 m in 1855. Tension piles resist uplift from liquefaction. The underpass is due for completion in October 2014 and the park in March 2015.

About this research paper

What this paper is about

This paper outlines the National War Memorial Park underpass and park project in Wellington New Zealand. The 15,000+m2 park is being separated from traffic by a 300 m long cut and cover trench and tunnel of which 138m is a rectangular box section tunnel. The parkrs opening will commemorate the 100th anniversary of the Anzac Gallipoli landings. To enable completion in time for Anzac Day 25 April 2015 the resource consent process of the park and underpass was expedited through the passing by the NZ Parliament of the National War Memorial Park (Pukeahu) Empowering Act 2012. Design and construction is being undertaken by an Alliance. A summary is given of the local history, project enabling legislation, park and underpass designs, ground and surface water issues, enabling works, community engagement and creche relocation. Structural and geotechnical considerations are described including earthquake responses to seismic inertia, lateral spreading and uplift. There are over 5 faults within 20 km of the site that have return periods less than 2500 years, one of which raised the nearby Basin Reserve by 1 - 1.5 m in 1855. Tension piles resist uplift from liquefaction. The underpass is due for completion in October 2014 and the park in March 2015.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper outlines the National War Memorial Park underpass and park project in Wellington New Zealand. The 15,000+m2 park is being separated from traffic by a 300 m long cut and cover trench and tunnel of which 138m is a rectangular box section tunnel. The parkrs opening will commemorate the 100th anniversary of the Anzac Gallipoli landings. To enable completion in time for Anzac Day 25 April 2015 the resource consent process of the park and underpass was expedited through the passing by the NZ Parliament of the National War Memorial Park (Pukeahu) Empowering Act 2012. Design and construction is being undertaken by an Alliance. A summary is given of the local history, project enabling legislation, park and underpass designs, ground and surface water issues, enabling works, community engagement and creche relocation. Structural and geotechnical considerations are described including earthquake responses to seismic inertia, lateral spreading and uplift. There are over 5 faults within 20 km of the site that have return periods less than 2500 years, one of which raised the nearby Basin Reserve by 1 - 1.5 m in 1855. Tension piles resist uplift from liquefaction. The underpass is due for completion in October 2014 and the park in March 2015.

Key concepts: Relocation, Engineering, National park, Forensic engineering, Civil engineering, Archaeology, Geography, Programming language

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and construction of New Zealand War Memorial Park and underpass — Research Paper | ScholarLens