Rapid Bridge Construction in New Hampshire

Mark D Whittemore, Peter E. Stamnas

Open publisher page 1 citations

Abstract

This article describes a rapid bridge replacement project in Epping, New Hampshire. The project was the state's first site to incorporate fast-track construction methods. The goal was to develop a concept that could be used to replace a typical medium-span bridge using a spread footing, cantilever-style abutment substructure. The new structure consists of a 115-foot long adjacent box beam superstructure supported by an all precast concrete substructure. The precast concrete components allowed the project, which normally would have taken 4 to 6 months to construct, to be completed in just 8 days.

About this research paper

What this paper is about

This article describes a rapid bridge replacement project in Epping, New Hampshire. The project was the state's first site to incorporate fast-track construction methods. The goal was to develop a concept that could be used to replace a typical medium-span bridge using a spread footing, cantilever-style abutment substructure. The new structure consists of a 115-foot long adjacent box beam superstructure supported by an all precast concrete substructure. The precast concrete components allowed the project, which normally would have taken 4 to 6 months to construct, to be completed in just 8 days.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article describes a rapid bridge replacement project in Epping, New Hampshire. The project was the state's first site to incorporate fast-track construction methods. The goal was to develop a concept that could be used to replace a typical medium-span bridge using a spread footing, cantilever-style abutment substructure. The new structure consists of a 115-foot long adjacent box beam superstructure supported by an all precast concrete substructure. The precast concrete components allowed the project, which normally would have taken 4 to 6 months to construct, to be completed in just 8 days.

Key concepts: Precast concrete, Bridge (graph theory), Engineering, Abutment, Substructure, Structural engineering, Civil engineering, Medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
Rapid Bridge Construction in New Hampshire — Research Paper | ScholarLens