2003Institute of Transportation Engineers 2003 Annual Meeting and Exhibit (held in conjunction with ITE District 6 Annual Meeting)Institute of Transportation Engineers (ITE)Requires access

SAN FRANCISCO BAY AREA HIGH-OCCUPANCY VEHICLE (HOV) LANE MASTER PLAN

W R Loudon, Lee Klieman, Doug Kimsey

Open publisher page 0 citations

Abstract

DKS Associates worked with the Metropolitan Transportation Commission (MTC) to produce an update of the HOV Lane Master Plan for the nine-county San Francisco Bay Area. This paper reports on that process and the results from the effort. The master plan update effort included studying and making recommendations that address four elements that have not been the focus of previous master planning efforts in the Bay Area. HOV lane enforcement was one key element. The project team worked closely with MTC, Caltrans and the California Highway Patrol to identify the most effective strategies for reducing lane-use violations with the least impact on freeway and expressway operations, drawing heavily on national experience. In a second element, the project team looked closely at the gaps in the already extensive HOV lane system. Special attention was given to analysis of the freeway-to-freeway connections for HOV lanes. A third significant element of the master plan update was the analysis of the region's express bus network and its relationship to the HOV lane system. Explicit consideration was given to how the express bus system could be most effectively expanded and how the HOV lane system could be improved to support to the express bus services. A final element of the master plan update was re-examination of how the future improvements to the HOV system will improve air quality. The project included simulation of one HOV corridor to address this final issue.

About this research paper

What this paper is about

DKS Associates worked with the Metropolitan Transportation Commission (MTC) to produce an update of the HOV Lane Master Plan for the nine-county San Francisco Bay Area. This paper reports on that process and the results from the effort. The master plan update effort included studying and making recommendations that address four elements that have not been the focus of previous master planning efforts in the Bay Area. HOV lane enforcement was one key element. The project team worked closely with MTC, Caltrans and the California Highway Patrol to identify the most effective strategies for reducing lane-use violations with the least impact on freeway and expressway operations, drawing heavily on national experience. In a second element, the project team looked closely at the gaps in the already extensive HOV lane system. Special attention was given to analysis of the freeway-to-freeway connections for HOV lanes. A third significant element of the master plan update was the analysis of the region's express bus network and its relationship to the HOV lane system. Explicit consideration was given to how the express bus system could be most effectively expanded and how the HOV lane system could be improved to support to the express bus services. A final element of the master plan update was re-examination of how the future improvements to the HOV system will improve air quality. The project included simulation of one HOV corridor to address this final issue.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

DKS Associates worked with the Metropolitan Transportation Commission (MTC) to produce an update of the HOV Lane Master Plan for the nine-county San Francisco Bay Area. This paper reports on that process and the results from the effort. The master plan update effort included studying and making recommendations that address four elements that have not been the focus of previous master planning efforts in the Bay Area. HOV lane enforcement was one key element. The project team worked closely with MTC, Caltrans and the California Highway Patrol to identify the most effective strategies for reducing lane-use violations with the least impact on freeway and expressway operations, drawing heavily on national experience. In a second element, the project team looked closely at the gaps in the already extensive HOV lane system. Special attention was given to analysis of the freeway-to-freeway connections for HOV lanes. A third significant element of the master plan update was the analysis of the region's express bus network and its relationship to the HOV lane system. Explicit consideration was given to how the express bus system could be most effectively expanded and how the HOV lane system could be improved to support to the express bus services. A final element of the master plan update was re-examination of how the future improvements to the HOV system will improve air quality. The project included simulation of one HOV corridor to address this final issue.

Key concepts: Master plan, Transport engineering, Plan (archaeology), Metropolitan area, Occupancy, Enforcement, Engineering, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
SAN FRANCISCO BAY AREA HIGH-OCCUPANCY VEHICLE (HOV) LANE MASTER PLAN — Research Paper | ScholarLens