Following the discovery of shear cracks at the interface of voided and solid sections of the spine beams, forming the deck in the main span of the three span Langleybury Lane bridge, temporary props were erected at its centre. The two existing raking piers were replaced with vertical ones and a permanent central pier was constructed to support the main span. Combinations of flat jacks and disc bearings were used to control reactions during transfer of the deck and subsequently to allow adjustment during the monitoring period. The deck could therefore be retained in a scheme providing positive benefits which conformed with current design and assessment standards. (A) For the covering abstract see IRRD 882313.

About this research paper

What this paper is about

Following the discovery of shear cracks at the interface of voided and solid sections of the spine beams, forming the deck in the main span of the three span Langleybury Lane bridge, temporary props were erected at its centre. The two existing raking piers were replaced with vertical ones and a permanent central pier was constructed to support the main span. Combinations of flat jacks and disc bearings were used to control reactions during transfer of the deck and subsequently to allow adjustment during the monitoring period. The deck could therefore be retained in a scheme providing positive benefits which conformed with current design and assessment standards. (A) For the covering abstract see IRRD 882313.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Following the discovery of shear cracks at the interface of voided and solid sections of the spine beams, forming the deck in the main span of the three span Langleybury Lane bridge, temporary props were erected at its centre. The two existing raking piers were replaced with vertical ones and a permanent central pier was constructed to support the main span. Combinations of flat jacks and disc bearings were used to control reactions during transfer of the deck and subsequently to allow adjustment during the monitoring period. The deck could therefore be retained in a scheme providing positive benefits which conformed with current design and assessment standards. (A) For the covering abstract see IRRD 882313.

Key concepts: Deck, Span (engineering), Bridge (graph theory), Pier, Bridge deck, Structural engineering, Engineering, Forensic engineering