Why and when to test your timber bridges: some case studies
Keith Crews, B Samali, Curtis Champion
Abstract
Keith Crews, B Samali, Curtis Champion
Abstract
The UTS IIPWEA assessment procedures provide a relatively simple, yet sophisticated method for testing timber bridges in order to quantify safe load capacity. Over 150 bridges and 350 spans have now been tested using this award- winning innovative method. This experience has highlighted a number of different reasons you might test particular bridges to help you manage these critical links in the road network. For example: 1. a new industry setting up that will require access over existing bridges: what is their capacity?; 2. Railcorp has put load limits on bridges over rail in your area which is severely restricting access -can this be modified for specific vehicle types?; 3. you need to make a funding application for a grant and need to support it by solid evidence; 4. can the strength of a particular bridge be significantly improved by replacement of a limited number of girders -which ones, how much will the load capacity increase? (a) For the covering entry of this conference, please see ITRD abstract no. E213488.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The UTS IIPWEA assessment procedures provide a relatively simple, yet sophisticated method for testing timber bridges in order to quantify safe load capacity. Over 150 bridges and 350 spans have now been tested using this award- winning innovative method. This experience has highlighted a number of different reasons you might test particular bridges to help you manage these critical links in the road network. For example: 1. a new industry setting up that will require access over existing bridges: what is their capacity?; 2. Railcorp has put load limits on bridges over rail in your area which is severely restricting access -can this be modified for specific vehicle types?; 3. you need to make a funding application for a grant and need to support it by solid evidence; 4. can the strength of a particular bridge be significantly improved by replacement of a limited number of girders -which ones, how much will the load capacity increase? (a) For the covering entry of this conference, please see ITRD abstract no. E213488.
Key concepts: Bridge (graph theory), Engineering, Transport engineering, Test (biology), Order (exchange), Business, Medicine, Paleontology