MCLEOD RIVER BRIDGE : EMERGENCY STABILIZATION

B. P. Ramsay

Open publisher page 0 citations

Abstract

The McLeod River Bridge is a four span bridge with 33.5 metre long prestressed concrete girders supported on reinforced concrete piers and abutments. The pier foundations are spread footings keyed into shale bedrock. Over the past 25 years the river has shifted within its bed and now strikes the piers at an angle of approximately 40 degrees. This angle of attack has resulted in scour at the piers, particularly at the centre pier (Pier 2). At Pier 2 the scour level adjacent to the pier extends to 1.5 metres below the bottom of the footing. In January 2000, Alberta Transportation decided that a permanent structural solution was required to protect Pier 2 against failure due to scour and that the pier required protection prior to spring breakup. The time frame available to carry out the design and construction of the required work was less that 12 weeks. This aggressive schedule could only be achieved through close cooperation between the client (Alberta Transportation), consultant (UMA Engineering), environmental approving agencies and those contractors invited to tender for the work on an invitational tender basis. A structural solution, involving the use of large drilled piles into each end of an extended pier shaft was developed to underpin Pier 2. The underpinning was designed to ressist ice loads striking the pier at angles of up to 40 degrees. After the completion of the design, a decision was made to delay the construction of the underpinning until the fall of 2000 due to a mild winter and the anticiation of an early spring breakup. Construction began in September 2000 and was completed in December 2000. The cost of the work, including the placing of rock riprap, was approximately $800,000. For the covering abstract of this conference see ITRD number E201066. (A)

About this research paper

What this paper is about

The McLeod River Bridge is a four span bridge with 33.5 metre long prestressed concrete girders supported on reinforced concrete piers and abutments. The pier foundations are spread footings keyed into shale bedrock. Over the past 25 years the river has shifted within its bed and now strikes the piers at an angle of approximately 40 degrees. This angle of attack has resulted in scour at the piers, particularly at the centre pier (Pier 2). At Pier 2 the scour level adjacent to the pier extends to 1.5 metres below the bottom of the footing. In January 2000, Alberta Transportation decided that a permanent structural solution was required to protect Pier 2 against failure due to scour and that the pier required protection prior to spring breakup. The time frame available to carry out the design and construction of the required work was less that 12 weeks. This aggressive schedule could only be achieved through close cooperation between the client (Alberta Transportation), consultant (UMA Engineering), environmental approving agencies and those contractors invited to tender for the work on an invitational tender basis. A structural solution, involving the use of large drilled piles into each end of an extended pier shaft was developed to underpin Pier 2. The underpinning was designed to ressist ice loads striking the pier at angles of up to 40 degrees. After the completion of the design, a decision was made to delay the construction of the underpinning until the fall of 2000 due to a mild winter and the anticiation of an early spring breakup. Construction began in September 2000 and was completed in December 2000. The cost of the work, including the placing of rock riprap, was approximately $800,000. For the covering abstract of this conference see ITRD number E201066. (A)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The McLeod River Bridge is a four span bridge with 33.5 metre long prestressed concrete girders supported on reinforced concrete piers and abutments. The pier foundations are spread footings keyed into shale bedrock. Over the past 25 years the river has shifted within its bed and now strikes the piers at an angle of approximately 40 degrees. This angle of attack has resulted in scour at the piers, particularly at the centre pier (Pier 2). At Pier 2 the scour level adjacent to the pier extends to 1.5 metres below the bottom of the footing. In January 2000, Alberta Transportation decided that a permanent structural solution was required to protect Pier 2 against failure due to scour and that the pier required protection prior to spring breakup. The time frame available to carry out the design and construction of the required work was less that 12 weeks. This aggressive schedule could only be achieved through close cooperation between the client (Alberta Transportation), consultant (UMA Engineering), environmental approving agencies and those contractors invited to tender for the work on an invitational tender basis. A structural solution, involving the use of large drilled piles into each end of an extended pier shaft was developed to underpin Pier 2. The underpinning was designed to ressist ice loads striking the pier at angles of up to 40 degrees. After the completion of the design, a decision was made to delay the construction of the underpinning until the fall of 2000 due to a mild winter and the anticiation of an early spring breakup. Construction began in September 2000 and was completed in December 2000. The cost of the work, including the placing of rock riprap, was approximately $800,000. For the covering abstract of this conference see ITRD number E201066. (A)

Key concepts: Pier, Engineering, Underpinning, Geotechnical engineering, Girder, Bridge (graph theory), Riprap, Geology