DEEPWATER MOORING SYSTEM HELPS SAVE TIME
W.D. Moore
Abstract
W.D. Moore
Abstract
A combination chain/rope anchor line system that allows quick mooring in 600 to 2000-ft water depths is described. The innovative mooring systems, now being used by Zapata Off-Shore Co. on it new rigs, has demonstrated significant time savings in deepwater anchoring. The system, used on SS-2000 class semisubmersibles, is designed to be run out, set, and retrieved quickly and easily using existing anchor-handling workboats and equipment permanently installed on the rig.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A combination chain/rope anchor line system that allows quick mooring in 600 to 2000-ft water depths is described. The innovative mooring systems, now being used by Zapata Off-Shore Co. on it new rigs, has demonstrated significant time savings in deepwater anchoring. The system, used on SS-2000 class semisubmersibles, is designed to be run out, set, and retrieved quickly and easily using existing anchor-handling workboats and equipment permanently installed on the rig.
Key concepts: Marine engineering, Rope, Mooring, Shore, Anchoring, Engineering, Computer science, Geology