2007ENRRequires access

Engineers Swarm on U.S. Bridges to Check for Flaws

T Ichniowski, T F Armistead, Tom Sawyer, Jonathan Barnes, Bruce Buckley, Lucy Bodilly

Open publisher page 0 citations

Abstract

This article discusses the inspection of bridges across the United States in light of the collapse of Minnesota’s I-35W bridge. The replacement of the bridge in Minneapolis by the Minnesota Department of Transportation (MNDOT) is similarly discussed. The new bridge design is substantially larger than the former bridge, with ten lanes and four shoulders instead of six and two, respectively. There will also be an anticipated 100 year service life on the new structure at a cost of $150 million. The state will need to negotiate with the Federal Highway Administration (FHWA) regarding funding from the Emergency Relief (ER) fund, as that funding will not cover capacity increases. Structures with deficiencies that were highlighted by the disaster included Tappan Zee Bridge in New York and New Jersey’s Pulaski Skyway.

About this research paper

What this paper is about

This article discusses the inspection of bridges across the United States in light of the collapse of Minnesota’s I-35W bridge. The replacement of the bridge in Minneapolis by the Minnesota Department of Transportation (MNDOT) is similarly discussed. The new bridge design is substantially larger than the former bridge, with ten lanes and four shoulders instead of six and two, respectively. There will also be an anticipated 100 year service life on the new structure at a cost of $150 million. The state will need to negotiate with the Federal Highway Administration (FHWA) regarding funding from the Emergency Relief (ER) fund, as that funding will not cover capacity increases. Structures with deficiencies that were highlighted by the disaster included Tappan Zee Bridge in New York and New Jersey’s Pulaski Skyway.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article discusses the inspection of bridges across the United States in light of the collapse of Minnesota’s I-35W bridge. The replacement of the bridge in Minneapolis by the Minnesota Department of Transportation (MNDOT) is similarly discussed. The new bridge design is substantially larger than the former bridge, with ten lanes and four shoulders instead of six and two, respectively. There will also be an anticipated 100 year service life on the new structure at a cost of $150 million. The state will need to negotiate with the Federal Highway Administration (FHWA) regarding funding from the Emergency Relief (ER) fund, as that funding will not cover capacity increases. Structures with deficiencies that were highlighted by the disaster included Tappan Zee Bridge in New York and New Jersey’s Pulaski Skyway.

Key concepts: Bridge (graph theory), Engineering, Highway system, Transport engineering, Forensic engineering, Civil engineering, Public administration, Political science

Related papers

Back to paper searchBrowse research topicsOriginal source
Engineers Swarm on U.S. Bridges to Check for Flaws — Research Paper | ScholarLens