2011Austroads Bridge Conference, 8th, 2011, Sydney, New South Wales, AustraliaRequires access

Restoration of the historic Tharwa Bridge

John Hilton, M Prelog, Sam Millie

Open publisher page 0 citations

Abstract

The restoration of Tharwa Bridge in the ACT has achieved the objective of providing a high level flood route and main thoroughfare across the Murrumbidgee River, while preserving the structure's national heritage value. The design has kept as close as possible to the original arrangement by Percy Allan, with innovative modifications in the design of the truss and choice of materials increasing the overall capacity and durability of the bridge. A commitment to quality and use of modern construction techniques has delivered a timber truss bridge with an enduring visual appeal while performing its basic function. The spirit of collaboration in an alliance framework has been a key feature in the formulation and application of innovation in design, while fostering strong relationships between all parties.

About this research paper

What this paper is about

The restoration of Tharwa Bridge in the ACT has achieved the objective of providing a high level flood route and main thoroughfare across the Murrumbidgee River, while preserving the structure's national heritage value. The design has kept as close as possible to the original arrangement by Percy Allan, with innovative modifications in the design of the truss and choice of materials increasing the overall capacity and durability of the bridge. A commitment to quality and use of modern construction techniques has delivered a timber truss bridge with an enduring visual appeal while performing its basic function. The spirit of collaboration in an alliance framework has been a key feature in the formulation and application of innovation in design, while fostering strong relationships between all parties.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The restoration of Tharwa Bridge in the ACT has achieved the objective of providing a high level flood route and main thoroughfare across the Murrumbidgee River, while preserving the structure's national heritage value. The design has kept as close as possible to the original arrangement by Percy Allan, with innovative modifications in the design of the truss and choice of materials increasing the overall capacity and durability of the bridge. A commitment to quality and use of modern construction techniques has delivered a timber truss bridge with an enduring visual appeal while performing its basic function. The spirit of collaboration in an alliance framework has been a key feature in the formulation and application of innovation in design, while fostering strong relationships between all parties.

Key concepts: Bridge (graph theory), Truss bridge, Truss, Engineering, Alliance, Civil engineering, Flood myth, Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Restoration of the historic Tharwa Bridge — Research Paper | ScholarLens