2005Railway ageRequires access

Still a Pioneer

Julian Wolinsky

Open publisher page 0 citations

Abstract

Tri-County Metropolitan Transit District, Portland, Oregon's regional transit agency, has been planning and building TriMet for more than three decades. The system has become an integrated rail transit system as well as a model for transportation planners throughout North America. TriMet currently includes three light rail transit (LRT) lines totaling 44.3 miles and a modern streetcar system that covers the downtown core with three route miles of track, and under construction is a 0.6 mile streetcar extension , and TriMet's first foray into commuter rail is in final design. Two more LRT branches, a new LRT line, and two streetcar extensions are not far behind. TriMet remains a vital part of the region's urban fabrik and policy of simulating economic growth. Rail transit has progressed this far as the result of several factors that have reached a nexus: a desire to reduce sprawl and improve the environment, a citizen freeway revolt, and the need to diminish fuel consumption. Some of the innovations adopted by TriMet are traffic signal pre-emption, pedestrian safety measures, use of reserved lanes downtown, and development of five transit centers to provide convenient interchanges between rail and buses. The success of Portland's rail transit can be credited to a large part to the ongoing support of elected officials and the business community, a key ingredient in generating federal funding.

About this research paper

What this paper is about

Tri-County Metropolitan Transit District, Portland, Oregon's regional transit agency, has been planning and building TriMet for more than three decades. The system has become an integrated rail transit system as well as a model for transportation planners throughout North America. TriMet currently includes three light rail transit (LRT) lines totaling 44.3 miles and a modern streetcar system that covers the downtown core with three route miles of track, and under construction is a 0.6 mile streetcar extension , and TriMet's first foray into commuter rail is in final design. Two more LRT branches, a new LRT line, and two streetcar extensions are not far behind. TriMet remains a vital part of the region's urban fabrik and policy of simulating economic growth. Rail transit has progressed this far as the result of several factors that have reached a nexus: a desire to reduce sprawl and improve the environment, a citizen freeway revolt, and the need to diminish fuel consumption. Some of the innovations adopted by TriMet are traffic signal pre-emption, pedestrian safety measures, use of reserved lanes downtown, and development of five transit centers to provide convenient interchanges between rail and buses. The success of Portland's rail transit can be credited to a large part to the ongoing support of elected officials and the business community, a key ingredient in generating federal funding.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Tri-County Metropolitan Transit District, Portland, Oregon's regional transit agency, has been planning and building TriMet for more than three decades. The system has become an integrated rail transit system as well as a model for transportation planners throughout North America. TriMet currently includes three light rail transit (LRT) lines totaling 44.3 miles and a modern streetcar system that covers the downtown core with three route miles of track, and under construction is a 0.6 mile streetcar extension , and TriMet's first foray into commuter rail is in final design. Two more LRT branches, a new LRT line, and two streetcar extensions are not far behind. TriMet remains a vital part of the region's urban fabrik and policy of simulating economic growth. Rail transit has progressed this far as the result of several factors that have reached a nexus: a desire to reduce sprawl and improve the environment, a citizen freeway revolt, and the need to diminish fuel consumption. Some of the innovations adopted by TriMet are traffic signal pre-emption, pedestrian safety measures, use of reserved lanes downtown, and development of five transit centers to provide convenient interchanges between rail and buses. The success of Portland's rail transit can be credited to a large part to the ongoing support of elected officials and the business community, a key ingredient in generating federal funding.

Key concepts: Downtown, Transport engineering, Metropolitan area, Urban sprawl, Transit (satellite), Mile, Public transport, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Still a Pioneer — Research Paper | ScholarLens