2007Ground engineeringRequires access

A rocky road

A. B. Wynne

Open publisher page 0 citations

Abstract

The Welsh Assembly Government, UK, awarded Alfred McAlpine a #10 million design and build contract to improve the 4km stretch of road between Blaenau Ffestiniog and Cancoed in Wales. The main challenge was to ensure that the road remained open during the scheme. In addition, the project involved the protection of two listed bridges and a listed weighbridge. Engineers are using a reinforced soil system to protect the listed structures in a 200m diversion to divert traffic away from a triple-arch bridge that will be demolished and rebuilt. Temporary concrete abutments and PU32 steel sheet piles have been installed as a base for the soil-reinforcement structure. Huesker Fortrac 55/30 and 35/30 geogrids have been used to form a wraparound reinforced soil structure. Temporary wooden shutters support the edge of the new embankment. The depth of the layer of fill and strength of the geogrid varies along the diversion. The Blaenau Ffestiniog to Llandudno railway, which runs close to the west side of the site, is being monitored to ensure that there is no movement. The workers have also had to be careful not to dislodge the local slate tip. A dead roller is being used instead of a vibratory roller to compact the fill. The road has been widened to allow more room for pedestrians and cyclists.

About this research paper

What this paper is about

The Welsh Assembly Government, UK, awarded Alfred McAlpine a #10 million design and build contract to improve the 4km stretch of road between Blaenau Ffestiniog and Cancoed in Wales. The main challenge was to ensure that the road remained open during the scheme. In addition, the project involved the protection of two listed bridges and a listed weighbridge. Engineers are using a reinforced soil system to protect the listed structures in a 200m diversion to divert traffic away from a triple-arch bridge that will be demolished and rebuilt. Temporary concrete abutments and PU32 steel sheet piles have been installed as a base for the soil-reinforcement structure. Huesker Fortrac 55/30 and 35/30 geogrids have been used to form a wraparound reinforced soil structure. Temporary wooden shutters support the edge of the new embankment. The depth of the layer of fill and strength of the geogrid varies along the diversion. The Blaenau Ffestiniog to Llandudno railway, which runs close to the west side of the site, is being monitored to ensure that there is no movement. The workers have also had to be careful not to dislodge the local slate tip. A dead roller is being used instead of a vibratory roller to compact the fill. The road has been widened to allow more room for pedestrians and cyclists.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Welsh Assembly Government, UK, awarded Alfred McAlpine a #10 million design and build contract to improve the 4km stretch of road between Blaenau Ffestiniog and Cancoed in Wales. The main challenge was to ensure that the road remained open during the scheme. In addition, the project involved the protection of two listed bridges and a listed weighbridge. Engineers are using a reinforced soil system to protect the listed structures in a 200m diversion to divert traffic away from a triple-arch bridge that will be demolished and rebuilt. Temporary concrete abutments and PU32 steel sheet piles have been installed as a base for the soil-reinforcement structure. Huesker Fortrac 55/30 and 35/30 geogrids have been used to form a wraparound reinforced soil structure. Temporary wooden shutters support the edge of the new embankment. The depth of the layer of fill and strength of the geogrid varies along the diversion. The Blaenau Ffestiniog to Llandudno railway, which runs close to the west side of the site, is being monitored to ensure that there is no movement. The workers have also had to be careful not to dislodge the local slate tip. A dead roller is being used instead of a vibratory roller to compact the fill. The road has been widened to allow more room for pedestrians and cyclists.

Key concepts: Geogrid, Culvert, Arch, Geotechnical engineering, Engineering, Levee, Geosynthetics, Bridge (graph theory)