BRIDGE MANAGEMENT IN WESTERN AUSTRALIA. PROCEEDINGS, SIXTH CONFERENCE, ROAD ENGINEERING ASSOCIATION OF ASIA AND AUSTRALASIA, 4-10 MARCH 1990, KUALA LUMPUR, VOLUMES 1 TO 5 AND POST CONFERENCE PROCEEDINGS
P M Palmer, P J Wyche
Abstract
P M Palmer, P J Wyche
Abstract
The paper describes new techniques which have been developed and applied in Western Australia for the maintenance of both timber and concrete bridges. It also discusses economic aspects of bridge management including the level of maintenance expenditure required in relation to bridge replacement value, the frequency of inspections, the options of undertaking work by direct labour or by contract, and the choice of bridge replacement or major renovation and strengthening. For the covering entry of the conference see IRRD 823206. (TRRL)
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper describes new techniques which have been developed and applied in Western Australia for the maintenance of both timber and concrete bridges. It also discusses economic aspects of bridge management including the level of maintenance expenditure required in relation to bridge replacement value, the frequency of inspections, the options of undertaking work by direct labour or by contract, and the choice of bridge replacement or major renovation and strengthening. For the covering entry of the conference see IRRD 823206. (TRRL)
Key concepts: Bridge (graph theory), Kuala lumpur, Engineering, Bridge maintenance, Work (physics), Transport engineering, Civil engineering, Forensic engineering