High Tech Tunnelling in Columbus
Steve Skelhorn
Abstract
Steve Skelhorn
Abstract
Construction of the Big Walnut Outfall Augmentation Sewer in Columbus, Ohio, a 4-kilometer long, 3.66-meter i.d. project, includes a crossing of six two-lane roads, a parking lot, the Big Walnut Creek and an existing sanitary sewer. The contract mandated an EPB machine, as well as dewatering, sealed shafts, slurry walls or auger casings. In addition, the tunnel boring machines (TBMs) were to include the latest enhancements to control and monitor settlement, and an extensive monitoring array.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Construction of the Big Walnut Outfall Augmentation Sewer in Columbus, Ohio, a 4-kilometer long, 3.66-meter i.d. project, includes a crossing of six two-lane roads, a parking lot, the Big Walnut Creek and an existing sanitary sewer. The contract mandated an EPB machine, as well as dewatering, sealed shafts, slurry walls or auger casings. In addition, the tunnel boring machines (TBMs) were to include the latest enhancements to control and monitor settlement, and an extensive monitoring array.
Key concepts: Engineering, Dewatering, Civil engineering, Settlement (finance), Parking lot, Sewerage, Mining engineering, Forensic engineering