DUMMY SPAN SOLVES M55 HEADACHE

Harry F. Ferguson

Open publisher page 0 citations

Abstract

The author examines the problems which arose in the construction of the M55 motorway due to variable ground conditions between Blackpool and Preston. Layers of peat and running sand had to be shifted and replaced by rockfill up to 6M thick. At the Lancaster canal a sloping peat layer led to the use of a dummy span to prevent the canal from slipping which was inserted at a safe distance from the canal. The central pier, 56 steel-cased 450mm diameter piles were sunk 14-15M through the peat to bear on the stiff clay below. Each of the 22.7M spans consists of 20 precast prestressed box beams with reinforced concrete infill. Details are also given of the drainage layer, which consists of old stone sets and hardcore taken from a nearby wartime aerodrome. 6.5M further east, the M55 joins the northern end of the Preston bypass, which forms a spur for the M6 to the A6. The spur is being improved to take extra traffic, and a new fly-over carries the motorway over the A6 roundabout. Costs are quoted. /TRRL/

About this research paper

What this paper is about

The author examines the problems which arose in the construction of the M55 motorway due to variable ground conditions between Blackpool and Preston. Layers of peat and running sand had to be shifted and replaced by rockfill up to 6M thick. At the Lancaster canal a sloping peat layer led to the use of a dummy span to prevent the canal from slipping which was inserted at a safe distance from the canal. The central pier, 56 steel-cased 450mm diameter piles were sunk 14-15M through the peat to bear on the stiff clay below. Each of the 22.7M spans consists of 20 precast prestressed box beams with reinforced concrete infill. Details are also given of the drainage layer, which consists of old stone sets and hardcore taken from a nearby wartime aerodrome. 6.5M further east, the M55 joins the northern end of the Preston bypass, which forms a spur for the M6 to the A6. The spur is being improved to take extra traffic, and a new fly-over carries the motorway over the A6 roundabout. Costs are quoted. /TRRL/

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The author examines the problems which arose in the construction of the M55 motorway due to variable ground conditions between Blackpool and Preston. Layers of peat and running sand had to be shifted and replaced by rockfill up to 6M thick. At the Lancaster canal a sloping peat layer led to the use of a dummy span to prevent the canal from slipping which was inserted at a safe distance from the canal. The central pier, 56 steel-cased 450mm diameter piles were sunk 14-15M through the peat to bear on the stiff clay below. Each of the 22.7M spans consists of 20 precast prestressed box beams with reinforced concrete infill. Details are also given of the drainage layer, which consists of old stone sets and hardcore taken from a nearby wartime aerodrome. 6.5M further east, the M55 joins the northern end of the Preston bypass, which forms a spur for the M6 to the A6. The spur is being improved to take extra traffic, and a new fly-over carries the motorway over the A6 roundabout. Costs are quoted. /TRRL/

Key concepts: Precast concrete, Peat, Span (engineering), Geotechnical engineering, Geology, Carriageway, Engineering, Structural engineering