EXODERMIC DECK BOOSTS BRIDGE LOAD RATING
R A Bettigole
Abstract
R A Bettigole
Abstract
It is described how New York State Department of Transportation selected an exodermic deck for a bridge project to solve two major problems: rapid design and construction; and the need for HS-20 load rating. The bridge carries County Road 61 over the Mohawk River in St. Johnsville, New York. Since it was possible to close the structure to traffic during the rehabilitation, the concrete component of the bridge deck was poured in-place, saving time and money, and providing a monolithic concrete surface without a need for a separate wearing surface. The details of the construction are briefly described. The exodermic deck permitted the bridge to be rated for HS-20 loads while assuring rapid construction. The new deck is signigficantly stiffer and stronger than the reinforced deck it replaced.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
It is described how New York State Department of Transportation selected an exodermic deck for a bridge project to solve two major problems: rapid design and construction; and the need for HS-20 load rating. The bridge carries County Road 61 over the Mohawk River in St. Johnsville, New York. Since it was possible to close the structure to traffic during the rehabilitation, the concrete component of the bridge deck was poured in-place, saving time and money, and providing a monolithic concrete surface without a need for a separate wearing surface. The details of the construction are briefly described. The exodermic deck permitted the bridge to be rated for HS-20 loads while assuring rapid construction. The new deck is signigficantly stiffer and stronger than the reinforced deck it replaced.
Key concepts: Deck, Bridge (graph theory), Bridge deck, Engineering, State highway, Driver rehabilitation, Civil engineering, Forensic engineering