The concrete slab track utilized by JNR (16 km on the Shin Kansen and 84 km on the narrow gauge line) has proved satisfactory and has shown the need for little maintenance. Therefore concrete slab track is used for 70% of the line between Okayama and Hakata. This article describes design requirements, construction methods and track details. JNR has two types--one with minimum provision for adjustment used only on straight track in tunnels and the other with larger adjustment margin used on all elevated sections (straight or curved) and on curves in tunnels. For the 393 km line 12 concrete slab production facilities were set up, 60 slab distribution points, 58 mortar plants and 25 depots for rail and fastenings. JNR is researching additional problems associated with the slab track.

About this research paper

What this paper is about

The concrete slab track utilized by JNR (16 km on the Shin Kansen and 84 km on the narrow gauge line) has proved satisfactory and has shown the need for little maintenance. Therefore concrete slab track is used for 70% of the line between Okayama and Hakata. This article describes design requirements, construction methods and track details. JNR has two types--one with minimum provision for adjustment used only on straight track in tunnels and the other with larger adjustment margin used on all elevated sections (straight or curved) and on curves in tunnels. For the 393 km line 12 concrete slab production facilities were set up, 60 slab distribution points, 58 mortar plants and 25 depots for rail and fastenings. JNR is researching additional problems associated with the slab track.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The concrete slab track utilized by JNR (16 km on the Shin Kansen and 84 km on the narrow gauge line) has proved satisfactory and has shown the need for little maintenance. Therefore concrete slab track is used for 70% of the line between Okayama and Hakata. This article describes design requirements, construction methods and track details. JNR has two types--one with minimum provision for adjustment used only on straight track in tunnels and the other with larger adjustment margin used on all elevated sections (straight or curved) and on curves in tunnels. For the 393 km line 12 concrete slab production facilities were set up, 60 slab distribution points, 58 mortar plants and 25 depots for rail and fastenings. JNR is researching additional problems associated with the slab track.

Key concepts: Slab, Track (disk drive), Engineering, Structural engineering, Line (geometry), Work (physics), Geotechnical engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
LARGE SCALE CONSTRUCTION WORK OF CONCRETE SLAB TRACKS FOR THE SAN-YO SHINKANSEN — Research Paper | ScholarLens