2005ITE 2005 Annual Meeting and Exhibit Compendium of Technical PapersInstitute of Transportation Engineers (ITE)ARRB Group Ltd.Requires access

A Case Study of the Design Issues Associated with HOV toHOT Conversion

Caroline Brabrook Cour

Open publisher page 0 citations

Abstract

By the end of 2005 there will be six High Occupancy Toll (HOT) Lane facilities operational in the United States. In all but one of the six facilities, the HOT lanes are conversions from High Occupancy Vehicle (HOV) lanes. In addition to HOT Lanes that will be open later this year, there are many more around the United States that are currently being studied and evaluated. There are many issues to consider in the conversion from HOV to HOT lanes including: public support, tolling technology, design, environmental impacts, operations and maintenance and revenue collection. Because the HOT lane concept is new, each of these concepts is equally critical in ensuring that the conversion is viewed as a success. In 2003 the Washington State Department of Transportation was directed by their Transportation Commission to study the feasibility of the conversion of an existing HOV lanes facility to a HOT lane for the purposes of pilot project. Following the selection of the project corridor, the State conducted a feasibility study. To ensure the success of the pilot project, a sophisticated approach was followed for the selection of the Pilot Project corridor and of the design of the HOT Lane.

About this research paper

What this paper is about

By the end of 2005 there will be six High Occupancy Toll (HOT) Lane facilities operational in the United States. In all but one of the six facilities, the HOT lanes are conversions from High Occupancy Vehicle (HOV) lanes. In addition to HOT Lanes that will be open later this year, there are many more around the United States that are currently being studied and evaluated. There are many issues to consider in the conversion from HOV to HOT lanes including: public support, tolling technology, design, environmental impacts, operations and maintenance and revenue collection. Because the HOT lane concept is new, each of these concepts is equally critical in ensuring that the conversion is viewed as a success. In 2003 the Washington State Department of Transportation was directed by their Transportation Commission to study the feasibility of the conversion of an existing HOV lanes facility to a HOT lane for the purposes of pilot project. Following the selection of the project corridor, the State conducted a feasibility study. To ensure the success of the pilot project, a sophisticated approach was followed for the selection of the Pilot Project corridor and of the design of the HOT Lane.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

By the end of 2005 there will be six High Occupancy Toll (HOT) Lane facilities operational in the United States. In all but one of the six facilities, the HOT lanes are conversions from High Occupancy Vehicle (HOV) lanes. In addition to HOT Lanes that will be open later this year, there are many more around the United States that are currently being studied and evaluated. There are many issues to consider in the conversion from HOV to HOT lanes including: public support, tolling technology, design, environmental impacts, operations and maintenance and revenue collection. Because the HOT lane concept is new, each of these concepts is equally critical in ensuring that the conversion is viewed as a success. In 2003 the Washington State Department of Transportation was directed by their Transportation Commission to study the feasibility of the conversion of an existing HOV lanes facility to a HOT lane for the purposes of pilot project. Following the selection of the project corridor, the State conducted a feasibility study. To ensure the success of the pilot project, a sophisticated approach was followed for the selection of the Pilot Project corridor and of the design of the HOT Lane.

Key concepts: Toll, Transport engineering, Occupancy, Revenue, Pilot program, Commission, Engineering, Business

Related papers

Back to paper searchBrowse research topicsOriginal source
A Case Study of the Design Issues Associated with HOV toHOT Conversion — Research Paper | ScholarLens