BROOK HILL ROUNDABOUT, SHEFFIELD: A BEFORE-AND-AFTER STUDY
R Ashworth
Abstract
R Ashworth
Abstract
Observations were made of traffic delays and the 35 m diameter small-island layout was introduced. The before study covered the period prior to any alternation of the original roundabout layout, whilst the after study was carried out 8 months completion of the new roundabout traffic capacity experiment. The pattern of traffic movements through the intersection during both morning and afternoon peak hours and typical off-peak periods were recorded, as well as traffic delay during these periods. The results confirm that the increased capacity shown in observations has led to a reduction in delays to vehicles despite increases of 8 to 10 percent in the peak hour traffic volumes. Peak hour delays are estimated to have been reduced by some 3500 veh-hr per annum.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Observations were made of traffic delays and the 35 m diameter small-island layout was introduced. The before study covered the period prior to any alternation of the original roundabout layout, whilst the after study was carried out 8 months completion of the new roundabout traffic capacity experiment. The pattern of traffic movements through the intersection during both morning and afternoon peak hours and typical off-peak periods were recorded, as well as traffic delay during these periods. The results confirm that the increased capacity shown in observations has led to a reduction in delays to vehicles despite increases of 8 to 10 percent in the peak hour traffic volumes. Peak hour delays are estimated to have been reduced by some 3500 veh-hr per annum.
Key concepts: Roundabout, Morning, Intersection (aeronautics), Transport engineering, Environmental science, Mathematics, Engineering, Medicine