Observations were made of traffic delays and the 35 m diameter small-island layout was introduced. The before study covered the period prior to any alternation of the original roundabout layout, whilst the after study was carried out 8 months completion of the new roundabout traffic capacity experiment. The pattern of traffic movements through the intersection during both morning and afternoon peak hours and typical off-peak periods were recorded, as well as traffic delay during these periods. The results confirm that the increased capacity shown in observations has led to a reduction in delays to vehicles despite increases of 8 to 10 percent in the peak hour traffic volumes. Peak hour delays are estimated to have been reduced by some 3500 veh-hr per annum.

About this research paper

What this paper is about

Observations were made of traffic delays and the 35 m diameter small-island layout was introduced. The before study covered the period prior to any alternation of the original roundabout layout, whilst the after study was carried out 8 months completion of the new roundabout traffic capacity experiment. The pattern of traffic movements through the intersection during both morning and afternoon peak hours and typical off-peak periods were recorded, as well as traffic delay during these periods. The results confirm that the increased capacity shown in observations has led to a reduction in delays to vehicles despite increases of 8 to 10 percent in the peak hour traffic volumes. Peak hour delays are estimated to have been reduced by some 3500 veh-hr per annum.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Observations were made of traffic delays and the 35 m diameter small-island layout was introduced. The before study covered the period prior to any alternation of the original roundabout layout, whilst the after study was carried out 8 months completion of the new roundabout traffic capacity experiment. The pattern of traffic movements through the intersection during both morning and afternoon peak hours and typical off-peak periods were recorded, as well as traffic delay during these periods. The results confirm that the increased capacity shown in observations has led to a reduction in delays to vehicles despite increases of 8 to 10 percent in the peak hour traffic volumes. Peak hour delays are estimated to have been reduced by some 3500 veh-hr per annum.

Key concepts: Roundabout, Morning, Intersection (aeronautics), Transport engineering, Environmental science, Mathematics, Engineering, Medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
BROOK HILL ROUNDABOUT, SHEFFIELD: A BEFORE-AND-AFTER STUDY — Research Paper | ScholarLens