A STUDY OF DELAYED FINISHING OF CONCRETE SLABS

J H Swanberg

Open publisher page 0 citations

Abstract

THE PERIOD OF ELAPSED TIME BEFORE THE SECOND SCREEDING OPERATION WAS INCREASED TO DETERMINE WHETHER THIS WOULD OVERCOME CERTAIN AIR-ENTRAINED CONCRETE PLACEMENT DIFFICULTIES. THE RESISTANCE OF THE CONCRETE TO FREEZING AND THAWING WAS DETERMINED TO ASCERTAIN WHETHER CONCRETE DURABILITY WAS ADVERSELY AFFECTED BY THE DELAYED FINISHING OPERATIONS. IT WAS INDICATED THAT: (1) FINISHING CAN BE DELAYED LONGER WITH CONCRETES MADE WITH BLENDED CEMENTS (15% NATURAL, 85% PORTLAND) AND AIR ENTRAINING CEMENT THAN WITH STANDARD PORTLAND CEMENT AND VIBRATED BLENDED CEMENT CONCRETE MIXTURE; (2) IN NO CASE DOES SHRINKAGE OR SWELL SERIOUSLY AFFECT FINISHING OR PAVEMENT SMOOTHNESS; (3) FREEZE THAW RESISTANCE IS NOT REDUCED; AND (4) MORE UNIFORM CONCRETE IS OBTAINED WITH AIR ENTRAINING CEMENTS OR CEMENT BLENDS, IN THE AMOUNTS FOUND THROUGH THIS RESEARCH. /AUTHOR/

About this research paper

What this paper is about

THE PERIOD OF ELAPSED TIME BEFORE THE SECOND SCREEDING OPERATION WAS INCREASED TO DETERMINE WHETHER THIS WOULD OVERCOME CERTAIN AIR-ENTRAINED CONCRETE PLACEMENT DIFFICULTIES. THE RESISTANCE OF THE CONCRETE TO FREEZING AND THAWING WAS DETERMINED TO ASCERTAIN WHETHER CONCRETE DURABILITY WAS ADVERSELY AFFECTED BY THE DELAYED FINISHING OPERATIONS. IT WAS INDICATED THAT: (1) FINISHING CAN BE DELAYED LONGER WITH CONCRETES MADE WITH BLENDED CEMENTS (15% NATURAL, 85% PORTLAND) AND AIR ENTRAINING CEMENT THAN WITH STANDARD PORTLAND CEMENT AND VIBRATED BLENDED CEMENT CONCRETE MIXTURE; (2) IN NO CASE DOES SHRINKAGE OR SWELL SERIOUSLY AFFECT FINISHING OR PAVEMENT SMOOTHNESS; (3) FREEZE THAW RESISTANCE IS NOT REDUCED; AND (4) MORE UNIFORM CONCRETE IS OBTAINED WITH AIR ENTRAINING CEMENTS OR CEMENT BLENDS, IN THE AMOUNTS FOUND THROUGH THIS RESEARCH. /AUTHOR/

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE PERIOD OF ELAPSED TIME BEFORE THE SECOND SCREEDING OPERATION WAS INCREASED TO DETERMINE WHETHER THIS WOULD OVERCOME CERTAIN AIR-ENTRAINED CONCRETE PLACEMENT DIFFICULTIES. THE RESISTANCE OF THE CONCRETE TO FREEZING AND THAWING WAS DETERMINED TO ASCERTAIN WHETHER CONCRETE DURABILITY WAS ADVERSELY AFFECTED BY THE DELAYED FINISHING OPERATIONS. IT WAS INDICATED THAT: (1) FINISHING CAN BE DELAYED LONGER WITH CONCRETES MADE WITH BLENDED CEMENTS (15% NATURAL, 85% PORTLAND) AND AIR ENTRAINING CEMENT THAN WITH STANDARD PORTLAND CEMENT AND VIBRATED BLENDED CEMENT CONCRETE MIXTURE; (2) IN NO CASE DOES SHRINKAGE OR SWELL SERIOUSLY AFFECT FINISHING OR PAVEMENT SMOOTHNESS; (3) FREEZE THAW RESISTANCE IS NOT REDUCED; AND (4) MORE UNIFORM CONCRETE IS OBTAINED WITH AIR ENTRAINING CEMENTS OR CEMENT BLENDS, IN THE AMOUNTS FOUND THROUGH THIS RESEARCH. /AUTHOR/

Key concepts: Air entrainment, Portland cement, Durability, Shrinkage, Cement, Materials science, Composite material, Aggregate (composite)