FULL SPEED AHEAD

A Cho, S H Daniels

Open publisher page 1 citations

Abstract

The reconstruction of Interstate 15 (I-15) through 17 mi (27 km) of Salt Lake City, Utah, is already exceeding everyone's expectations. Now halfway complete, the pioneering $1.5-billion design-build project could usher in a new era of highway building before it is finished. Only bad weather looms as a possible deterrent to a pace that has cut several weeks off the already fast-track schedule that aims to finish construction in 4.5 years instead of the more normal 7-10 years. Construction is divided into three segments. The approximately 4-mi-long (6-km) Downtown segment makes up the northern end of I-15 through the heart of Salt Lake City. The Jordan segment, of similar length, comprises I-15's intersections with State Route 201 and I-215. A bridge at the northernmost end of I-15 was demolished in May 1997. Replacing it is a 90-m-wide, hourglass-shaped overpass at the I-80 junction. Most work initially began on the southernmost 9-mi-long (14-km) Cottonwood segment.

About this research paper

What this paper is about

The reconstruction of Interstate 15 (I-15) through 17 mi (27 km) of Salt Lake City, Utah, is already exceeding everyone's expectations. Now halfway complete, the pioneering $1.5-billion design-build project could usher in a new era of highway building before it is finished. Only bad weather looms as a possible deterrent to a pace that has cut several weeks off the already fast-track schedule that aims to finish construction in 4.5 years instead of the more normal 7-10 years. Construction is divided into three segments. The approximately 4-mi-long (6-km) Downtown segment makes up the northern end of I-15 through the heart of Salt Lake City. The Jordan segment, of similar length, comprises I-15's intersections with State Route 201 and I-215. A bridge at the northernmost end of I-15 was demolished in May 1997. Replacing it is a 90-m-wide, hourglass-shaped overpass at the I-80 junction. Most work initially began on the southernmost 9-mi-long (14-km) Cottonwood segment.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The reconstruction of Interstate 15 (I-15) through 17 mi (27 km) of Salt Lake City, Utah, is already exceeding everyone's expectations. Now halfway complete, the pioneering $1.5-billion design-build project could usher in a new era of highway building before it is finished. Only bad weather looms as a possible deterrent to a pace that has cut several weeks off the already fast-track schedule that aims to finish construction in 4.5 years instead of the more normal 7-10 years. Construction is divided into three segments. The approximately 4-mi-long (6-km) Downtown segment makes up the northern end of I-15 through the heart of Salt Lake City. The Jordan segment, of similar length, comprises I-15's intersections with State Route 201 and I-215. A bridge at the northernmost end of I-15 was demolished in May 1997. Replacing it is a 90-m-wide, hourglass-shaped overpass at the I-80 junction. Most work initially began on the southernmost 9-mi-long (14-km) Cottonwood segment.

Key concepts: Downtown, Salt lake, Schedule, Pace, Geography, Meteorology, Bridge (graph theory), Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
FULL SPEED AHEAD — Research Paper | ScholarLens