2001University of Minnesota Digital Conservancy (University of Minnesota)Requires access

Evaluation of a Field Permeameter to Measure Saturated Hydraulic Conductivity of Base/Subgrade Materials.

Timothy R Clyne, Vaughan R. Voller, Björn Birgisson

Open publisher page 4 citations

Abstract

This report presents the results of a cooperative study on the field use of a permeameter, built by researchers at the Minnesota Department of Transportation (Mn/DOT) and the University of Minnesota, to estimate the saturated hydraulic conductivity of pavement base materials. Field measurements using the permeameter were taken on various highway construction projects, and researchers measured the saturated hydraulic conductivity of samples in the laboratory. Researchers also reviewed theories for converting a field-measured flow rate into a saturated hydraulic conductivity estimate. By numerical simulation and analysis of the field data, researchers determined an appropriate method for converting the Mn/DOT permeameter flow measurements into estimates of hydraulic conductivity. Variations between the field estimated and laboratory measured hydraulic conductivity are within one order of magnitude. Variations between the field estimate and numerical simulation, however, are much closer. The study found the Mn/DOT permeameter can be used to obtain a reliable estimate of the base hydraulic conductivity provided that the base layer is at least 15 cm (six inches) deep. When the base is to thin, permeameter readings are restricted to early infiltration times.

About this research paper

What this paper is about

This report presents the results of a cooperative study on the field use of a permeameter, built by researchers at the Minnesota Department of Transportation (Mn/DOT) and the University of Minnesota, to estimate the saturated hydraulic conductivity of pavement base materials. Field measurements using the permeameter were taken on various highway construction projects, and researchers measured the saturated hydraulic conductivity of samples in the laboratory. Researchers also reviewed theories for converting a field-measured flow rate into a saturated hydraulic conductivity estimate. By numerical simulation and analysis of the field data, researchers determined an appropriate method for converting the Mn/DOT permeameter flow measurements into estimates of hydraulic conductivity. Variations between the field estimated and laboratory measured hydraulic conductivity are within one order of magnitude. Variations between the field estimate and numerical simulation, however, are much closer. The study found the Mn/DOT permeameter can be used to obtain a reliable estimate of the base hydraulic conductivity provided that the base layer is at least 15 cm (six inches) deep. When the base is to thin, permeameter readings are restricted to early infiltration times.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This report presents the results of a cooperative study on the field use of a permeameter, built by researchers at the Minnesota Department of Transportation (Mn/DOT) and the University of Minnesota, to estimate the saturated hydraulic conductivity of pavement base materials. Field measurements using the permeameter were taken on various highway construction projects, and researchers measured the saturated hydraulic conductivity of samples in the laboratory. Researchers also reviewed theories for converting a field-measured flow rate into a saturated hydraulic conductivity estimate. By numerical simulation and analysis of the field data, researchers determined an appropriate method for converting the Mn/DOT permeameter flow measurements into estimates of hydraulic conductivity. Variations between the field estimated and laboratory measured hydraulic conductivity are within one order of magnitude. Variations between the field estimate and numerical simulation, however, are much closer. The study found the Mn/DOT permeameter can be used to obtain a reliable estimate of the base hydraulic conductivity provided that the base layer is at least 15 cm (six inches) deep. When the base is to thin, permeameter readings are restricted to early infiltration times.

Key concepts: Permeameter, Hydraulic conductivity, Geotechnical engineering, Conductivity, Base flow, Subgrade, Infiltration (HVAC), Base (topology)

Related papers

Back to paper searchBrowse research topicsOriginal source
Evaluation of a Field Permeameter to Measure Saturated Hydraulic Conductivity of Base/Subgrade Materials. — Research Paper | ScholarLens