2002Unpublished venueRequires access

A2/M2 WIDENING: THE USE OF GEOSYNTHETICS FOR REINFORCED SLOPES

S. P. Corbet, J Rigby-Jones, M Naylor, David M. Patterson, P Boulton

Open publisher page 1 citations

Abstract

The widening of the A2/M2 trunk road/motorway in north Kent runs from Cobham at the west end across the River Medway on a new bridge to junction 4 of the M2 south of Chatham. The work involved constructing a new 4 lane carriageway alongside the existing 2 lane dual carriageway, the new carriageway carries the west bound traffic. The space available for construction was restricted in a narrow corridor in which the new high speed Channel Tunnel Rail Link (CTRL) has also been constructed. The new works included nine geogrid reinforced soil slopes with wrap around green face slopes with finished heights up to 16m. This paper describes the selection of materials, the design and construction of these reinforced slopes. For the covering abstract see ITRD E117244.

About this research paper

What this paper is about

The widening of the A2/M2 trunk road/motorway in north Kent runs from Cobham at the west end across the River Medway on a new bridge to junction 4 of the M2 south of Chatham. The work involved constructing a new 4 lane carriageway alongside the existing 2 lane dual carriageway, the new carriageway carries the west bound traffic. The space available for construction was restricted in a narrow corridor in which the new high speed Channel Tunnel Rail Link (CTRL) has also been constructed. The new works included nine geogrid reinforced soil slopes with wrap around green face slopes with finished heights up to 16m. This paper describes the selection of materials, the design and construction of these reinforced slopes. For the covering abstract see ITRD E117244.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The widening of the A2/M2 trunk road/motorway in north Kent runs from Cobham at the west end across the River Medway on a new bridge to junction 4 of the M2 south of Chatham. The work involved constructing a new 4 lane carriageway alongside the existing 2 lane dual carriageway, the new carriageway carries the west bound traffic. The space available for construction was restricted in a narrow corridor in which the new high speed Channel Tunnel Rail Link (CTRL) has also been constructed. The new works included nine geogrid reinforced soil slopes with wrap around green face slopes with finished heights up to 16m. This paper describes the selection of materials, the design and construction of these reinforced slopes. For the covering abstract see ITRD E117244.

Key concepts: Carriageway, Geotechnical engineering, Bridge (graph theory), Geology, Engineering, Civil engineering, Internal medicine, Medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
A2/M2 WIDENING: THE USE OF GEOSYNTHETICS FOR REINFORCED SLOPES — Research Paper | ScholarLens