PAVEMENT MANAGEMENT SYSTEM: DEMONSTRATION FOR WASHINGTON COUNTIES. FINAL REPORT

R Kulkarni, F N Finn

Open publisher page 0 citations

Abstract

The pavement management system developed by the State of Washington was modified to meet the needs of the counties in the State of Washington within the constraints of available data and resources. The modified system, called the Washington County Pavement Management System (WCPMS), was tested for Thurston and Benton counties. Results of this testing show that; (1) the WCPMS can be operated using the existing data in the county road log in combination with collected pavement condition survey data; (2) computer resources are available to most counties to access the State computer to execute the various programs in the WCPMS; and (3) routine usage of the WCPMS for a network of 1000 miles will require a level of effort of about 150 person-days and a computer cost of $1,000.

About this research paper

What this paper is about

The pavement management system developed by the State of Washington was modified to meet the needs of the counties in the State of Washington within the constraints of available data and resources. The modified system, called the Washington County Pavement Management System (WCPMS), was tested for Thurston and Benton counties. Results of this testing show that; (1) the WCPMS can be operated using the existing data in the county road log in combination with collected pavement condition survey data; (2) computer resources are available to most counties to access the State computer to execute the various programs in the WCPMS; and (3) routine usage of the WCPMS for a network of 1000 miles will require a level of effort of about 150 person-days and a computer cost of $1,000.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The pavement management system developed by the State of Washington was modified to meet the needs of the counties in the State of Washington within the constraints of available data and resources. The modified system, called the Washington County Pavement Management System (WCPMS), was tested for Thurston and Benton counties. Results of this testing show that; (1) the WCPMS can be operated using the existing data in the county road log in combination with collected pavement condition survey data; (2) computer resources are available to most counties to access the State computer to execute the various programs in the WCPMS; and (3) routine usage of the WCPMS for a network of 1000 miles will require a level of effort of about 150 person-days and a computer cost of $1,000.

Key concepts: Pavement management, State highway, State (computer science), Transport engineering, Computer science, Engineering, Algorithm