EXPANSION STARTS AS METRORAIL'S CORE NETWORK IS COMPLETED

William D. Middleton

Open publisher page 0 citations

Abstract

The opening of the final section of the Washington DC Area Metropolitan Transit Authority's Metrorail Green Line ends a 31 year construction project to complete the 166km, 83 station system, included in the area's Adopted Regional Rail System plan. This 10.5km five-station extension is expected to increase rail traffic by 22,000 daily trips, so helping to alleviate fast growing population growth and congestion problems of Washington Metropolitan area. Metrorail now has a current weekday average of over 600,000 trips, where 40% of those working in the core employment area served by Metrorail arrive by public transport. Key to a high level of public transport use has been a number of land-use projects developed to exploit the potential of rail services. Details are given of future expansion plans to Dulles Airport.

About this research paper

What this paper is about

The opening of the final section of the Washington DC Area Metropolitan Transit Authority's Metrorail Green Line ends a 31 year construction project to complete the 166km, 83 station system, included in the area's Adopted Regional Rail System plan. This 10.5km five-station extension is expected to increase rail traffic by 22,000 daily trips, so helping to alleviate fast growing population growth and congestion problems of Washington Metropolitan area. Metrorail now has a current weekday average of over 600,000 trips, where 40% of those working in the core employment area served by Metrorail arrive by public transport. Key to a high level of public transport use has been a number of land-use projects developed to exploit the potential of rail services. Details are given of future expansion plans to Dulles Airport.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The opening of the final section of the Washington DC Area Metropolitan Transit Authority's Metrorail Green Line ends a 31 year construction project to complete the 166km, 83 station system, included in the area's Adopted Regional Rail System plan. This 10.5km five-station extension is expected to increase rail traffic by 22,000 daily trips, so helping to alleviate fast growing population growth and congestion problems of Washington Metropolitan area. Metrorail now has a current weekday average of over 600,000 trips, where 40% of those working in the core employment area served by Metrorail arrive by public transport. Key to a high level of public transport use has been a number of land-use projects developed to exploit the potential of rail services. Details are given of future expansion plans to Dulles Airport.

Key concepts: Metropolitan area, TRIPS architecture, Transport engineering, Public transport, Traffic congestion, Plan (archaeology), Population, Transit (satellite)

Related papers

Back to paper searchBrowse research topicsOriginal source
EXPANSION STARTS AS METRORAIL'S CORE NETWORK IS COMPLETED — Research Paper | ScholarLens