Four out of ninety eight bridges on a 116.9 km railway section between Gostum and Titograd are made of prefabricated prestressed concrete beams. All four structures were constructed by means of a launching device of domestic design and manufacture. The launching device MZM 30/500 can be used in erecting prefabricated bridge beams with a span of up to 30 M long and up to 500 T in weight. This device enabled the designers to change the original design intended for these bridges and use prefabricated prestressed concrete instead. The illustrations give details of the bridge. Data on all the bridges forming this section are given in a table.

About this research paper

What this paper is about

Four out of ninety eight bridges on a 116.9 km railway section between Gostum and Titograd are made of prefabricated prestressed concrete beams. All four structures were constructed by means of a launching device of domestic design and manufacture. The launching device MZM 30/500 can be used in erecting prefabricated bridge beams with a span of up to 30 M long and up to 500 T in weight. This device enabled the designers to change the original design intended for these bridges and use prefabricated prestressed concrete instead. The illustrations give details of the bridge. Data on all the bridges forming this section are given in a table.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Four out of ninety eight bridges on a 116.9 km railway section between Gostum and Titograd are made of prefabricated prestressed concrete beams. All four structures were constructed by means of a launching device of domestic design and manufacture. The launching device MZM 30/500 can be used in erecting prefabricated bridge beams with a span of up to 30 M long and up to 500 T in weight. This device enabled the designers to change the original design intended for these bridges and use prefabricated prestressed concrete instead. The illustrations give details of the bridge. Data on all the bridges forming this section are given in a table.

Key concepts: Prestressed concrete, Bridge (graph theory), Section (typography), Engineering, Structural engineering, Span (engineering), Bar (unit), Precast concrete

Related papers

Back to paper searchBrowse research topicsOriginal source
PREFABRICATED PRESTRESSED CONCRETE BRIDGES ON THE BELGRADE-BAR RAILWAY — Research Paper | ScholarLens