PREFABRICATED PRESTRESSED CONCRETE BRIDGES ON THE BELGRADE-BAR RAILWAY
M Milisic
Abstract
M Milisic
Abstract
Four out of ninety eight bridges on a 116.9 km railway section between Gostum and Titograd are made of prefabricated prestressed concrete beams. All four structures were constructed by means of a launching device of domestic design and manufacture. The launching device MZM 30/500 can be used in erecting prefabricated bridge beams with a span of up to 30 M long and up to 500 T in weight. This device enabled the designers to change the original design intended for these bridges and use prefabricated prestressed concrete instead. The illustrations give details of the bridge. Data on all the bridges forming this section are given in a table.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Four out of ninety eight bridges on a 116.9 km railway section between Gostum and Titograd are made of prefabricated prestressed concrete beams. All four structures were constructed by means of a launching device of domestic design and manufacture. The launching device MZM 30/500 can be used in erecting prefabricated bridge beams with a span of up to 30 M long and up to 500 T in weight. This device enabled the designers to change the original design intended for these bridges and use prefabricated prestressed concrete instead. The illustrations give details of the bridge. Data on all the bridges forming this section are given in a table.
Key concepts: Prestressed concrete, Bridge (graph theory), Section (typography), Engineering, Structural engineering, Span (engineering), Bar (unit), Precast concrete