NORTHEAST CORRIDOR HIGH SPEED RAIL PASSENGER SERVICE IMPROVEMENT PROJECT. TASK 4A. SIGNALING AND COMMUNICATIONS
Janai Williams, G Pipas
Abstract
Janai Williams, G Pipas
Abstract
The report includes description of the present signal systems, recommendations and description of the changes required to support high-speed passenger service, and corresponding cost estimates for the Northeast Corridor (Washington, D.C. to Boston, Massachusetts). Recommendations and descriptions cover the areas of proposed signal systems, track circuit requirements, impedance bonds, hazard protection devices, control systems, communications systems, training devices, installation schedule, and estimates of costs to procure and install such systems. Typical construction and installation specifications are included as an appendix.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The report includes description of the present signal systems, recommendations and description of the changes required to support high-speed passenger service, and corresponding cost estimates for the Northeast Corridor (Washington, D.C. to Boston, Massachusetts). Recommendations and descriptions cover the areas of proposed signal systems, track circuit requirements, impedance bonds, hazard protection devices, control systems, communications systems, training devices, installation schedule, and estimates of costs to procure and install such systems. Typical construction and installation specifications are included as an appendix.
Key concepts: Schedule, Service (business), Transport engineering, Communications system, Track (disk drive), Engineering, Cover (algebra), Telecommunications